Solving a multi-objective resource-constrained project scheduling problem using a cuckoo optimization algorithm

被引:0
|
作者
Ghamginzadeh, A. [1 ]
Najafi, A. A. [2 ]
Azimi, P. [1 ]
机构
[1] Islamic Azad Univ, Fac Ind & Mech Engn, Qazvin Branch, Qazvin, Iran
[2] KN Toosi Univ Technol, Fac Ind Engn, Tehran, Iran
关键词
Project scheduling; Net present value; Cuckoo optimization algorithm;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Scheduling is an important factor in project success. In the real world atmosphere, project scheduling problems involve multiple objectives which must be optimized simultaneously. According to the literature, several meta-heuristic algorithms have been used in single objective resource-constrained project scheduling problems, but very few of them have used a multi-objective framework. In this study, we focus on a multi-objective resource-constrained project scheduling problem by minimizing project completion time and the time value of project costs, which is the main contribution of the current research. The goal is to provide an algorithm that can find optimum Pareto front solutions, using a multi-objective cuckoo optimization algorithm. In order to increase the efficiency of the algorithm, the algorithm parameters are tuned using Taguchi tests. Finally, the solutions derived from the algorithm have been compared to those obtained from NSGA-II. The experiments show the efficiency of the proposed algorithm. (C) 2014 Sharif University of Technology. All rights reserved.
引用
收藏
页码:2419 / 2428
页数:10
相关论文
共 50 条
  • [31] Hybrid ant colony optimization in solving multi-skill resource-constrained project scheduling problem
    Paweł B. Myszkowski
    Marek E. Skowroński
    Łukasz P. Olech
    Krzysztof Oślizło
    Soft Computing, 2015, 19 : 3599 - 3619
  • [32] Hybrid ant colony optimization in solving multi-skill resource-constrained project scheduling problem
    Myszkowski, Pawel B.
    Skowronski, Marek E.
    Olech, Lukasz P.
    Oslizlo, Krzysztof
    SOFT COMPUTING, 2015, 19 (12) : 3599 - 3619
  • [33] An Improved Cuckoo Search Algorithm for Resource-Constrained Project Scheduling Problem with Generalized Precedence Relations
    Jin, Yidong
    Nie, Hui
    Duan, Pengfei
    Yang, Huihua
    PROCEEDINGS OF THE 2016 12TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2016, : 1086 - 1090
  • [34] Multi-Objective Multi-Skill Resource-Constrained Project Scheduling Considering Flexible Resource Profiles
    Luo, Xu
    Guo, Shunsheng
    Du, Baigang
    Luo, Xinhao
    Guo, Jun
    APPLIED SCIENCES-BASEL, 2024, 14 (05):
  • [35] New approaches for solving the resource-constrained project scheduling problem
    Kone, Oumar
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2013, 11 (01): : 93 - 94
  • [36] Solving resource-constrained project scheduling problem with evolutionary programming
    Sebt, M. H.
    Alipouri, Y.
    Alipouri, Y.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2013, 64 (09) : 1327 - 1335
  • [37] New approaches for solving the resource-constrained project scheduling problem
    Oumar Koné
    4OR, 2012, 10 : 105 - 106
  • [38] New approaches for solving the resource-constrained project scheduling problem
    Oumar Koné
    4OR, 2013, 11 : 93 - 94
  • [39] New approaches for solving the resource-constrained project scheduling problem
    Kone, Oumar
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2012, 10 (01): : 105 - 106
  • [40] Multi-objective resource constrained project scheduling problem based on improved ant colony optimization
    An X.
    Zhang Z.
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2019, 39 (02): : 509 - 519