Fuzzy Reliability Redundancy Allocation Problem Using Multi-factorial Evolutionary Algorithm

被引:3
|
作者
Shukla, Amit K. [1 ]
Chowdury, Md Abdul Malek [2 ]
Nath, Rahul [2 ]
Muhuri, Pranab K. [2 ]
机构
[1] Univ Jyvaskyla, Fac Informat Technol, Box 35 Agora, Jyvaskyla 40014, Finland
[2] South Asian Univ, Dept Comp Sci, New Delhi 110021, India
关键词
Fuzzy sets; Reliability-redundancy allocation problem (RRAP); Fuzzy Optimization; Multifactorial Optimization; OPTIMIZATION;
D O I
10.1109/SMC52423.2021.9658908
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
The Reliability Redundancy Allocation Problem (RRAP) is generally classified as a NP-hard problem. The RRAP aims to achieve the system's optimal reliability considering the minimum number of redundant system components while keeping volume, weight, and cost in mind as the key constraints. However, the dynamic changes in the manufacturing process lead to uncertainty in these system parameters, which makes them the suitable fit for being formulated as a fuzzy quantity. There are previous studies that have modelled the parameters as fuzzy and solved various fuzzy RRAP as separate problems to cope with the uncertainty. However, owing to some similarities between the cases, such as fuzzy series and complex bridge systems, they can also be solved simultaneously. As a result, using the Multi-factorial Evolutionary Algorithm (MFEA) method, this paper proposes a technique for simultaneously solving two fuzzy RRAP cases: fuzzy complex (bridge) and fuzzy series system. The similar characteristics of these two systems facilitate the evolution process through implicit knowledge. The experiments' findings demonstrate that the developed methodology, as compared to other evolutionary approaches using a benchmark dataset, was able to solve these problems effectively.
引用
收藏
页码:2512 / 2517
页数:6
相关论文
共 50 条
  • [21] An Improved Differential Evolution Algorithm for Reliability Redundancy Allocation Problem
    Liu, Yubao
    Qin, Guihe
    PROCEEDINGS 2013 INTERNATIONAL CONFERENCE ON MECHATRONIC SCIENCES, ELECTRIC ENGINEERING AND COMPUTER (MEC), 2013, : 1884 - 1887
  • [22] A multi-objective multi-factorial evolutionary algorithm with reference-point-based approach
    Huynh Thi Thanh Binh
    Nguyen Quoc Tuan
    Doan Cao Thanh Long
    2019 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2019, : 2824 - 2831
  • [23] Multi-task optimization in reliability redundancy allocation problem: A multifactorial evolutionary-based approach
    Chowdury, Md. Abdul Malek
    Nath, Rahul
    Shukla, Amit K.
    Rauniyar, Amit
    Muhuri, Pranab K.
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2024, 244
  • [25] Fuzzy reliability-redundancy allocation problem of the overspeed protection system
    Taghiyeh, Sajjad
    Mahmoudi, Morteza
    Fadaie, Saber
    Tohidi, Hossein
    ENGINEERING REPORTS, 2020, 2 (08)
  • [26] Optimization of time based fuzzy multi-objective reliability redundancy allocation problem for xj - out - of - m system using tuning and neighborhood based fuzzy MOPSO algorithm
    De, Satyajit
    Rakshit, Payel
    Chowdhury, Anil Bikash
    APPLIED SOFT COMPUTING, 2023, 149
  • [27] Type-2 fuzzy reliability–redundancy allocation problem and its solution using particle-swarm optimization algorithm
    Zubair Ashraf
    Pranab K. Muhuri
    Q. M. Danish Lohani
    Mukul Lata Roy
    Granular Computing, 2019, 4 : 145 - 166
  • [28] A multi-objective reliability-redundancy allocation problem with active redundancy and interval type-2 fuzzy parameters
    Kundu, Pradip
    OPERATIONAL RESEARCH, 2021, 21 (04) : 2433 - 2458
  • [29] A multi-objective reliability-redundancy allocation problem with active redundancy and interval type-2 fuzzy parameters
    Pradip Kundu
    Operational Research, 2021, 21 : 2433 - 2458
  • [30] Fuzzy Multi-objective Software Reliability Redundancy Allocation Based on MEDA-BFA Algorithm
    Hou Xue-mei
    Liu Wei
    Gao Fei
    Wang Jing
    ADVANCES IN MECHATRONICS AND CONTROL ENGINEERING, PTS 1-3, 2013, 278-280 : 2090 - 2093