Restricted assignment scheduling with resource constraints

被引:7
|
作者
Dosa, Gyorgy [1 ]
Kellerer, Hans [2 ]
Tuza, Zsolt [3 ,4 ]
机构
[1] Univ Pannonia, Dept Math, Egyet U 10, H-8200 Veszprem, Hungary
[2] Karl Franzens Univ Graz, Inst Stat & Operat Res, Univ Str 15, A-8010 Graz, Austria
[3] Hungarian Acad Sci, Alfred Renyi Inst Math, Realtanoda U 13-15, H-1053 Budapest, Hungary
[4] Univ Pannonia, Dept Comp Sci & Syst Technol, Egyet U 10, H-8200 Veszprem, Hungary
关键词
Scheduling; Restricted assignment; Resources; APX hardness; Graph coloting; PARALLEL DEDICATED MACHINES; APPROXIMATION; PROCESSORS; ALGORITHMS; TASKS;
D O I
10.1016/j.tcs.2018.08.016
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
We consider parallel machine scheduling with job assignment restrictions, i.e., each job can only be processed on a certain subset of the machines. Moreover, each job requires a set of renewable resources. Any resource can be used by only one job at any time. The objective is to minimize the makespan. We present approximation algorithms with constant worst-case bound in the case that each job requires only a fixed number of resources. For some special cases optimal algorithms with polynomial running time are given. If any job requires at most one resource and the number of machines is fixed, we give a PTAS. On the other hand we prove that the problem is APX-hard, even when there are just three machines and the input is restricted to unit-time jobs. (C) 2018 Published by Elsevier B.V.
引用
收藏
页码:72 / 87
页数:16
相关论文
共 50 条
  • [41] Scheduling of deconstruction projects under resource constraints
    Schultmann, Frank
    Rentz, Otto
    Construction Management and Economics, 2002, 20 (05) : 391 - 401
  • [42] Assignment of factors levels for design of experiments with resource constraints
    Smirnov, S.A.
    Glushchenko, O.O.
    Ilchuk, K.A.
    Makeenko, I.L.
    Oriekhova, N.A.
    Solid Mechanics and its Applications, 2014, 211 : 81 - 86
  • [43] ACS-based resource assignment and task scheduling in grid
    Qi, Chao
    Zhang, Jing
    Li, Junhuai
    Journal of Southeast University (English Edition), 2007, 23 (03) : 451 - 454
  • [44] Evolutionary resource assignment for workload-based production scheduling
    Moon, Ilkyeong
    Lee, Sanghyup
    Shin, Moonsoo
    Ryu, Kwangyeol
    JOURNAL OF INTELLIGENT MANUFACTURING, 2016, 27 (02) : 375 - 388
  • [45] Applications of resource assignment and scheduling with Petri Nets and heuristic search
    Gonzalo Mejía
    Carlos Montoya
    Annals of Operations Research, 2010, 181 : 795 - 812
  • [46] Applications of resource assignment and scheduling with Petri Nets and heuristic search
    Mejia, Gonzalo
    Montoya, Carlos
    ANNALS OF OPERATIONS RESEARCH, 2010, 181 (01) : 795 - 812
  • [47] Resource-Efficient Task Assignment and Scheduling in Optical Grids
    Kannasoot, Nipatjakorn
    Jue, Jason P.
    2010 CONFERENCE ON OPTICAL FIBER COMMUNICATION OFC COLLOCATED NATIONAL FIBER OPTIC ENGINEERS CONFERENCE OFC-NFOEC, 2010,
  • [48] Evolutionary resource assignment for workload-based production scheduling
    Ilkyeong Moon
    Sanghyup Lee
    Moonsoo Shin
    Kwangyeol Ryu
    Journal of Intelligent Manufacturing, 2016, 27 : 375 - 388
  • [49] ONE-MACHINE SCHEDULING PROBLEMS WITH RESOURCE CONSTRAINTS
    JANIAK, A
    LECTURE NOTES IN CONTROL AND INFORMATION SCIENCES, 1986, 84 : 358 - 364
  • [50] Project scheduling with time-varying resource constraints
    Klein, R
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (16) : 3937 - 3952