A two-stage integrating optimization of production scheduling, maintenance and quality

被引:12
|
作者
Zheng, Jiafei [1 ]
Yang, Hongbing [1 ]
Wu, Qingsong [1 ]
Wang, Ziyang [1 ]
机构
[1] Soochow Univ, Sch Mech & Elect Engn, Suzhou 215006, Jiangsu, Peoples R China
基金
中国国家自然科学基金;
关键词
Production scheduling; preventive maintenance; quality; control chart; genetic algorithm; PREVENTIVE MAINTENANCE; SUBJECT; SYSTEM; POLICY; MODEL;
D O I
10.1177/0954405420921733
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
During the process of actual production, production scheduling, preventive maintenance and quality control have a close interaction with each other and thus need to be integrated for improving manufacturing system performance. The aim of this article is to jointly optimize the job sequence, the preventive maintenance locations, the preventive maintenance interval and decision variables of control chart such that the expected cost per unit time and penalty cost due to schedule delay are minimized. A two-stage integrating optimization model of production scheduling, maintenance and quality in a single machine system is developed. A control chart is adopted to monitor the whole process with Taguchi's loss function estimating the quality cost of each condition and perfect preventive maintenance activity is conducted at the end of each interval. A genetic algorithm is designed to solve this model in order to obtain the optimal job sequence and the locations of preventive maintenance. Numerical examples and thorough sensitivity analyses are provided to illustrate the proposed integrated model. Finally, the efficiency of the proposed two-stage integration model is verified by the comparison of the stand-alone model under the same condition. Compared with the stand-alone model, the proposed integrated method can save the cost rate by 12%-42% under five different situations.
引用
收藏
页码:1448 / 1459
页数:12
相关论文
共 50 条
  • [1] Two-Stage Multiobjective Optimization of Maintenance Scheduling for Pavements
    Denysiuk, Roman
    Moreira, Andre V.
    Matos, Jose C.
    Oliveira, Joel R. M.
    Santos, Adriana
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2017, 23 (03)
  • [2] Bi-objective optimization for integrating production and preventive maintenance scheduling in two-stage assembly flow shop problem
    Seidgar, Hany
    Zandieh, Mostafa
    Mahdavi, Iraj
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2016, 33 (06) : 404 - 425
  • [3] Integrating production and transportation scheduling in a two-stage supply chain
    Liao, Ching-Jong
    Kuo, Yu-Wei
    Chung, Tsui-Ping
    Shih, Stephen C.
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2015, 9 (03) : 327 - 343
  • [4] Integrated optimization for production planning and scheduling in a two-stage production system
    An, Yu-Wei
    Yan, Hong-Sen
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2012, 18 (04): : 796 - 806
  • [5] Two-Stage Optimization Model for Life Cycle Maintenance Scheduling of Bridge Infrastructure
    Liu, Shu-Shun
    Huang, Hsin-Yi
    Risna Dyah Kumala, Nevy
    APPLIED SCIENCES-BASEL, 2020, 10 (24): : 1 - 26
  • [6] Two-stage multiprocessor flow shop scheduling with deteriorating maintenance in cleaner production
    Huang, Rong-Hwa
    Yu, Shun-Chi
    JOURNAL OF CLEANER PRODUCTION, 2016, 135 : 276 - 283
  • [7] Integrating production and transportation scheduling in a two-stage supply chain considering order assignment
    Zegordi, Seyed Hessameddin
    Nia, Mohammad Ali Beheshti
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 44 (9-10): : 928 - 939
  • [8] Integrating production and transportation scheduling in a two-stage supply chain considering order assignment
    Seyed Hessameddin Zegordi
    Mohammad Ali Beheshti Nia
    The International Journal of Advanced Manufacturing Technology, 2009, 44 : 928 - 939
  • [9] Two-stage production scheduling with an outsourcing option
    Lee, Kangbok
    Choi, Byung-Cheon
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 213 (03) : 489 - 497
  • [10] Scheduling production tasks in a two-stage FMS
    Blazewicz, J
    Pawlak, G
    Walter, B
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (17) : 4341 - 4352