Probabilistic service level guarantees in make-to-stock manufacturing systems

被引:51
|
作者
Bertsimas, D
Paschalidis, IC
机构
[1] MIT, Sloan Sch Management, Cambridge, MA 02139 USA
[2] Boston Univ, Dept Mfg Engn, Boston, MA 02215 USA
关键词
D O I
10.1287/opre.49.1.119.11183
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider a model of a multiclass make-to-stock manufacturing system. External demand for each product class is met from the available finished goods inventory; unsatisfied demand is backlogged. The objective is to devise a production policy that minimizes inventory costs subject to guaranteeing stockout probabilities to stay bounded above by given constants epsilon (j), for each product class j (service level guarantees). Such a policy determines whether the facility should be producing (idling decisions), and if it should, which product class (sequencing decisions). Approximating the original system, we analyze a corresponding fluid model to make sequencing decisions and employ large deviations techniques to make idling ones. We consider both linear and quadratic inventory cost structures to obtain a priority-based and a generalized longest queue first-bused production policy, respectively. An important feature of our model is that it accommodates autocorrelated demand and service processes, both critical features of modem failure-prone manufacturing systems.
引用
收藏
页码:119 / 133
页数:15
相关论文
共 50 条
  • [41] Base-stock control for single-product tandem make-to-stock systems
    Duenyas, Izak
    Patana-Anake, Prayoon
    [J]. IIE Transactions (Institute of Industrial Engineers), 1998, 30 (01): : 31 - 39
  • [42] Revenue management of a make-to-stock queue
    Caldentey, Rene
    Wein, Lawrence M.
    [J]. OPERATIONS RESEARCH, 2006, 54 (05) : 859 - 875
  • [43] ANALYZING THE POSTPONEMENT OF TIME PRODUCTION SYSTEMS IN MAKE-TO-STOCK AND SEASONAL DEMAND
    Chagas Rodrigues, Paulo Cesar
    Silva Marins, Fernando Augusto
    de Souza, Fernando Bernardi
    [J]. INDEPENDENT JOURNAL OF MANAGEMENT & PRODUCTION, 2011, 2 (02): : 25 - 43
  • [44] IPA derivatives for Make-to-Stock production-inventory systems with backorders
    Zhao, Yao
    Melamed, Benjamin
    [J]. METHODOLOGY AND COMPUTING IN APPLIED PROBABILITY, 2006, 8 (02) : 191 - 222
  • [45] IPA Derivatives for Make-to-Stock Production-Inventory Systems with Backorders
    Yao Zhao
    Benjamin Melamed
    [J]. Methodology and Computing in Applied Probability, 2006, 8 : 191 - 222
  • [46] Control of M/Cox-2/s make-to-stock systems
    Yucel, Ozgun
    Bulut, Oender
    [J]. INTERNATIONAL JOURNAL OF OPTIMIZATION AND CONTROL-THEORIES & APPLICATIONS-IJOCTA, 2020, 10 (01): : 26 - 36
  • [47] A hybrid manufacturing system with demand for intermediate goods and controllable make-to-stock production rate
    Kim, Hyunjung
    Kim, Eungab
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 303 (03) : 1244 - 1257
  • [48] Dynamic pooling of make-to-stock and make-to-order operations
    Zhang, Zhe George
    Kim, Ilhyung
    Springer, Mark
    Cai, Gangshu
    Yu, Yugang
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 144 (01) : 44 - 56
  • [49] The impact of manufacturing and supply chain improvement initiatives: A survey comparing make-to-order and make-to-stock firms
    Olhager, Jan
    Prajogo, Daniel I.
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2012, 40 (02): : 159 - 165
  • [50] Fixed-Cycle Smoothed Production Improves Lean Performance for Make-to-Stock Manufacturing
    Bernegger, Peter M.
    Webster, Scott
    [J]. INTERFACES, 2014, 44 (04) : 411 - 427