Fixed-Cycle Smoothed Production Improves Lean Performance for Make-to-Stock Manufacturing

被引:3
|
作者
Bernegger, Peter M. [1 ]
Webster, Scott [2 ]
机构
[1] Eastman Kodak Co, Rochester, NY 14652 USA
[2] Arizona State Univ, WP Carey Sch Business, Tempe, AZ 85287 USA
关键词
lean manufacturing; heijunka; takt; make-to-stock manufacturing; production control; ORDER INVENTORY SYSTEM; MODEL;
D O I
10.1287/inte.2014.0750
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Eastman Kodak Company is a well-known imaging and printing company that has been practicing lean manufacturing in its production and distribution operations for many years. Kodak manufactures a number of products with sufficient demand flow and volume relative to lot size so that its finishing operations are repetitive. For these products, it applies a production smoothing policy known as heijunka. Kodak's supply chain model also requires finished goods inventory to ensure an immediate and reliable supply to customers. Appropriate inventory and production control policies are needed to satisfy stochastic demand at a qualified fill rate and to set the cycle time per unit to replenish inventory at a level rate of supply. The lean production control process Kodak implemented initially was an elementary system of action limits prescribed by lean consultants. This system was difficult to interpret and performed erratically. Kodak replaced it with a new system based on operations research and statistical process control techniques, which analytically model the inventory and production control policies for stochastic demand and level supply. The new method improves operational control of lean manufacturing for a make-to-stock application that is realized in production schedule stability, product availability, and lower operating costs.
引用
收藏
页码:411 / 427
页数:17
相关论文
共 50 条
  • [1] Study of production seat booking system in a make-to-stock manufacturing process with fixed-lot-size production
    Hayashi C.
    Yamamoto H.
    Ohba M.
    Maruyama Y.
    Nakamura Y.
    [J]. 1600, Japan Industrial Management Association (72): : 110 - 122
  • [2] Optimal Production and Admission Policies in Make-to-Stock/Make-to-Order Manufacturing Systems
    Iravani, Seyed M. R.
    Liu, Tieming
    Simchi-Levi, David
    [J]. PRODUCTION AND OPERATIONS MANAGEMENT, 2012, 21 (02) : 224 - 235
  • [3] Strategic Production Process Design With Additive Manufacturing in a Make-to-Stock Environment
    Chua, Ping Chong
    Moon, Seung Ki
    Ng, Yen Ting
    Lopez, Manel
    [J]. JOURNAL OF MANUFACTURING SCIENCE AND ENGINEERING-TRANSACTIONS OF THE ASME, 2023, 145 (11):
  • [4] The impact of production time variability on make-to-stock queue performance
    Sanajian, Nima
    Balcioglu, Baris
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 194 (03) : 847 - 855
  • [5] A hybrid manufacturing system with demand for intermediate goods and controllable make-to-stock production rate
    Kim, Hyunjung
    Kim, Eungab
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 303 (03) : 1244 - 1257
  • [6] Production control and stock rationing for a make-to-stock system with parallel production channels
    Bulut, Onder
    Fadiloglu, Mehmet Murat
    [J]. IIE TRANSACTIONS, 2011, 43 (06) : 432 - 450
  • [7] Using process mining to improve productivity in make-to-stock manufacturing
    Lorenz, Rafael
    Senoner, Julian
    Sihn, Wilfried
    Netland, Torbjorn
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (16) : 4869 - 4880
  • [8] Probabilistic service level guarantees in make-to-stock manufacturing systems
    Bertsimas, D
    Paschalidis, IC
    [J]. OPERATIONS RESEARCH, 2001, 49 (01) : 119 - 133
  • [9] Managing Electricity Peak Loads in Make-To-Stock Manufacturing Lines
    Papier, Felix
    [J]. PRODUCTION AND OPERATIONS MANAGEMENT, 2016, 25 (10) : 1709 - 1726
  • [10] Inventory rationing, admission control, and production capacity allocation in a make-to-stock/make-to-order manufacturing system
    Kim, Eungab
    [J]. INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2024,