Study on Extensional Evaluation of Excavation Engineering Project Management Performance on OWA Operator

被引:0
|
作者
Guang, Hui [1 ]
Ren, Fei [2 ]
机构
[1] Shengda Trade Econ & Management Coll Zhengzhou, Dept Construct Engn, Zhengzhou, Peoples R China
[2] Sanmenxia Polytech, Dept Construct Engn Shengda, Sanmenxia, Peoples R China
关键词
Evaluation of performance; Excavation engineering; Matter-element model; OWA operator;
D O I
10.2991/978-94-6239-177-2_69
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In order to evaluate the performance of excavation engineering project effectively and discuss the scientific performance evaluation method of engineering project management, this paper built index system of foundation pit engineering project management performance evaluation, and on this basis, OWA method was used to empower the evaluation index for improving the objectivity of the evaluation results, and through the calculation of various evaluation indexes about the correlation of evaluation grades and characteristic values of evaluation grades by the matter element analysis method, this paper converted multi-objective evaluation into single objective evaluation, and evaluated the performance of excavation engineering project from the perspective of quantitative aspect, and the example analysis was used to verify that the evaluation of the performance of excavation engineering project is feasible and practical by the OWA operator and matter element analysis method.
引用
收藏
页码:675 / 684
页数:10
相关论文
共 50 条
  • [41] Measuring project performance and dynamic risk management for engineering design alliance
    Yan, Min-Ren
    Lee, Yung-Heng
    [J]. MEASURING BUSINESS EXCELLENCE, 2021, 25 (01) : 2 - 23
  • [42] Application of fuzzy comprehensive evaluation method in engineering project risk management
    Gao, Lang
    Li, Xin
    [J]. CONSTRUCTION AND URBAN PLANNING, PTS 1-4, 2013, 671-674 : 3087 - 3090
  • [43] Smart Project Management Information Systems (SPMIS) for Engineering Projects - Project Performance Monitoring & Reporting
    van Besouw, John
    Bond-Barnard, Taryn
    [J]. IJISPM-INTERNATIONAL JOURNAL OF INFORMATION SYSTEMS AND PROJECT MANAGEMENT, 2021, 9 (01): : 78 - 97
  • [44] Study on the Evaluation of PPP Construction Project Performance
    Xun, Zhiyuan
    Li, Weili
    Li, Weiling
    [J]. PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 151 - 154
  • [45] Project Performance Indicators of Engineering Design Groups: Evaluation and Proposed Improvement
    Hartono, B.
    Muhamad, I.
    [J]. 2014 IEEE INTERNATIONAL CONFERENCE ON MANAGEMENT OF INNOVATION AND TECHNOLOGY (ICMIT 2014), 2014, : 140 - 144
  • [46] A Study of the Functional Mechanism of Petrochemical Engineering Construction Project Management
    Wang, Ji-ming
    [J]. FRONTIERS OF ENGINEERING MANAGEMENT, 2014, 1 (02) : 129 - 139
  • [48] Improving Project Management Practice: An Engineering and Construction Case Study
    Carvalho, Sofia V.
    Tereso, Anabela P.
    Fernandes, Gabriela
    [J]. 2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 1777 - 1781
  • [49] Study on Project Management Information System of Engineering Based on WBS
    Bo, Niu
    Yi, Chang
    [J]. PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON INFORMATION SCIENCES, MACHINERY, MATERIALS AND ENERGY (ICISMME 2015), 2015, 126 : 700 - 704
  • [50] THE EFFECT OF A PROJECT MANAGEMENT OFFICE ON PROJECT AND ORGANISATIONAL PERFORMANCE: A CASE STUDY
    van der Linde, J.
    Steyn, H.
    [J]. SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2016, 27 (01): : 151 - 161