共 50 条
- [42] Application of fuzzy comprehensive evaluation method in engineering project risk management [J]. CONSTRUCTION AND URBAN PLANNING, PTS 1-4, 2013, 671-674 : 3087 - 3090
- [43] Smart Project Management Information Systems (SPMIS) for Engineering Projects - Project Performance Monitoring & Reporting [J]. IJISPM-INTERNATIONAL JOURNAL OF INFORMATION SYSTEMS AND PROJECT MANAGEMENT, 2021, 9 (01): : 78 - 97
- [44] Study on the Evaluation of PPP Construction Project Performance [J]. PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 151 - 154
- [45] Project Performance Indicators of Engineering Design Groups: Evaluation and Proposed Improvement [J]. 2014 IEEE INTERNATIONAL CONFERENCE ON MANAGEMENT OF INNOVATION AND TECHNOLOGY (ICMIT 2014), 2014, : 140 - 144
- [48] Improving Project Management Practice: An Engineering and Construction Case Study [J]. 2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 1777 - 1781
- [49] Study on Project Management Information System of Engineering Based on WBS [J]. PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON INFORMATION SCIENCES, MACHINERY, MATERIALS AND ENERGY (ICISMME 2015), 2015, 126 : 700 - 704
- [50] THE EFFECT OF A PROJECT MANAGEMENT OFFICE ON PROJECT AND ORGANISATIONAL PERFORMANCE: A CASE STUDY [J]. SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2016, 27 (01): : 151 - 161