共 50 条
- [41] Solving to Optimality a Discrete Lot-Sizing Problem Thanks to Multi-product Multi-period Valid Inequalities OPERATIONS RESEARCH AND ENTERPRISE SYSTEMS, ICORES 2014, 2015, 509 : 237 - 250
- [44] Multi-product Lot-Sizing Problem with Remanufacturing, Lost Sales and Sequence-Dependent Changeover Cost COMPUTATIONAL LOGISTICS, ICCL 2023, 2023, 14239 : 517 - 532
- [45] Multi-product capacitated disassembly lot-sizing problem with lost sales and possibility of defective disassembly components IFAC PAPERSONLINE, 2022, 55 (10): : 520 - 525
- [48] Extension of common cycle lot-size scheduling for multi-product, multi-stage arborescent flow-shop environment IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY, 2002, 26 (B1): : 55 - 68