A branch and bound based heuristic for multi-product resource constrained scheduling problem in FMS environment

被引:8
|
作者
Shanker, K [1 ]
Modi, BK [1 ]
机构
[1] Indian Inst Technol, Dept Ind Engn & Management, Kanpur 208016, Uttar Pradesh, India
关键词
scheduling; flexible manufacturing system; branch and bound; heuristics;
D O I
10.1016/S0377-2217(97)00433-5
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper addresses an inter-dependent multiple-product resource-constrained scheduling problem with the objective of makespan minimization in a flexible manufacturing system with resource flexibility. Both consumable and non-consumable resources are considered along with their alternative types and constrained utilization rates. A 0-1 integer linear programming formulation is presented for the problem. The complexity of the problem is observed to be at increase with the availability of alternate resources for product operations. A branch and bound based heuristic is proposed as a solution methodology A numerical example is presented to illustrate the problem and the effectiveness of the heuristic. (C) 1999 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:80 / 90
页数:11
相关论文
共 50 条
  • [1] An integrated model for multi-resource constrained scheduling problem considering multi-product and resource-sharing
    Liu, Changchun
    Xiang, Xi
    Zheng, Li
    Ma, Jing
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (19) : 6491 - 6511
  • [2] A hybrid heuristic for the multi-product straight pipeline scheduling problem
    Bamoumen, M.
    Belil, S.
    Elfirdoussi, S.
    Ren, L.
    Tchernev, N.
    [J]. IFAC PAPERSONLINE, 2019, 52 (13): : 535 - 540
  • [3] A Logic-based Branch and Bound Algorithm for Resource Constrained Scheduling Problem
    Zhang, Juyang
    Sun, Jigui
    Yang, Qingyun
    [J]. INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2006, 6 (2A): : 237 - 241
  • [4] A branch and bound algorithm for the resource-constrained project scheduling problem
    Brucker, P
    Knust, S
    Schoo, A
    Thiele, O
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 107 (02) : 272 - 288
  • [5] An heuristic algorithm for a multi-product, single machine capacitated production scheduling problem
    Bankston, JB
    Harnett, RM
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2000, 27 (01) : 77 - 92
  • [6] HEURISTIC FRAMEWORK FOR THE RESOURCE CONSTRAINED MULTI-PROJECT SCHEDULING PROBLEM
    KIM, SO
    SCHNIEDERJANS, MJ
    [J]. COMPUTERS & OPERATIONS RESEARCH, 1989, 16 (06) : 541 - 556
  • [7] A branch-and-bound algorithm for the resource-constrained project scheduling problem
    U. Dorndorf
    E. Pesch
    T. Phan-Huy
    [J]. Mathematical Methods of Operations Research, 2000, 52 : 413 - 439
  • [8] A branch-and-bound algorithm for the resource-constrained project scheduling problem
    Dorndorf, U
    Pesch, E
    Phan-Huy, T
    [J]. MATHEMATICAL METHODS OF OPERATIONS RESEARCH, 2000, 52 (03) : 413 - 439
  • [9] MULTIPLE RESOURCE - CONSTRAINED SCHEDULING USING BRANCH AND BOUND
    STINSON, JP
    DAVIS, EW
    KHUMAWALA, BM
    [J]. AIIE TRANSACTIONS, 1978, 10 (03): : 252 - 259
  • [10] A BRANCH-AND-BOUND PROCEDURE FOR THE MULTIPLE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
    DEMEULEMEESTER, E
    HERROELEN, W
    [J]. MANAGEMENT SCIENCE, 1992, 38 (12) : 1803 - 1818