Analysis on fuzzy integrated method of engineering project risk evaluation

被引:0
|
作者
Li, XY [1 ]
Dai, DS [1 ]
Zhang, K [1 ]
机构
[1] No Jiaotong Univ, Sch Econ & Management, Beijing 100044, Peoples R China
关键词
engineering project; risk evaluation; fuzzy mathematics integrated method;
D O I
暂无
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
On the basis of analyzing engineering project risk and fuzzy theory, a fuzzy integrated evaluation method combining subjective judgment and quantitative analysis is pointed out and applied to the evaluation of engineering project risk research. The method is demonstrated in a case.
引用
收藏
页码:52 / 55
页数:4
相关论文
共 50 条
  • [41] Study on Application of Successful Degree and Fuzzy Comprehensive Evaluation Method to Construction Engineering Project Post-Evaluation
    Yang Bo
    Huang Ying
    Li Huimin
    CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 2620 - 2623
  • [42] Project Evaluation and Analysis of Metrological Verification Regulation Based on Fuzzy Comprehensive Analysis Method
    Zhu Jing
    Liu Jiaxin
    2018 INTERNATIONAL SYMPOSIUM ON POWER ELECTRONICS AND CONTROL ENGINEERING (ISPECE 2018), 2019, 1187
  • [43] Risk and Income Evaluation Decision Model of PPP Project Based on Fuzzy Borda Method
    Du, Longbo
    Gao, Jing
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [44] Application of Fuzzy Comprehensive Evaluation Method Considering Risk Factors in Project Schedule Management
    Yi, Qinglin
    Wu, Juanjuan
    Dai, Tianfan
    ADVANCES IN INDUSTRIAL AND CIVIL ENGINEERING, PTS 1-4, 2012, 594-597 : 2976 - 2981
  • [45] Research on fuzzy-grey comprehensive evaluation method of power investment project risk
    Shi, Ying Ling
    Pang, Nan Sheng
    Li, Cun Bin
    Proceedings of CRIOCM 2006 International Research Symposium on Advancement of Construction Management and Real Estate, Vols 1 and 2, 2006, : 442 - 447
  • [46] Comprehensive Evaluation of Metro Project Bidding Risk Based on Entropy Value Method and Fuzzy
    Zhao, J. X.
    Liu, M.
    Li, L.
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY AND MANAGEMENT SCIENCE (ITMS 2015), 2015, 34 : 1170 - 1172
  • [47] Emergency Capability Evaluation Method of Engineering Project
    Yan, Zhigang
    Wang, Xueli
    Fu, Yingchun
    PROCEEDINGS OF INTERNATIONAL SYMPOSIUM ON EMERGENCY MANAGEMENT 2011, 2012, : 266 - 269
  • [48] Application of the Fuzzy Entropy Weight in Risk Assessment of the Engineering Project
    Wu, Xuyan
    Gu, Huiling
    Hu, Xujie
    Dong, Yuhong
    FIFTH INTERNATIONAL CONFERENCE ON INFORMATION ASSURANCE AND SECURITY, VOL 1, PROCEEDINGS, 2009, : 145 - +
  • [49] Application of Fuzzy Comprehensive Evaluation Model Based on Variable Fuzzy Set Method in Construction Enterprises' ERP Project Risk Evaluation
    Wu Yunna
    Huang Zhijun
    2008 INTERNATIONAL CONFERENCE ON RISK MANAGEMENT AND ENGINEERING MANAGEMENT, ICRMEM 2008, PROCEEDINGS, 2008, : 466 - 471
  • [50] Research on the Risk Evaluation of the Medical Care combined PPP Project Based on the Fuzzy Comprehensive Evaluation Method
    Wang, Lifang
    Xiong, Huaping
    CONFERENCE PROCEEDINGS OF THE 6TH INTERNATIONAL SYMPOSIUM ON PROJECT MANAGEMENT (ISPM2018), 2018, : 1287 - 1293