Long Term Evaluation of Advanced PCC System for Coal-fired Power Plant

被引:2
|
作者
Arakawa, Jun [1 ]
Okuno, Shinya [2 ]
Takano, Kenji [1 ]
Yamanaka, Yasuro [1 ]
Matsuyama, Toshiya [1 ]
Feron, Paul [3 ]
Cottrell, Aaron [3 ]
Cousins, Ashleigh [4 ]
Huang, Sanger [4 ]
Davies, Roland [5 ]
Sertori, Paul [5 ]
机构
[1] IHI Corp, Energy & Plant Operat, Koto Ku, 1-1,Toyosu 3 Chome, Tokyo 1358710, Japan
[2] IHI Corp, Corp Res & Dev, Isogo Ku, 1,Shin Nakahara Cho, Yokohama, Kanagawa 2358501, Japan
[3] CSIRO Energy, POB 330, Newcastle, NSW 2300, Australia
[4] CSIRO Energy, POB 883, Kenmore, Qld 4069, Australia
[5] AGL Loy Yang, Bartons Lane, Traralgon, Vic 3844, Australia
关键词
Post combustion; CO2; capture; amine solvent; coal fired power plant; Demonstration;
D O I
10.1016/j.egypro.2017.03.1253
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
IHI, with technical support from CSIRO, designed and constructed the "PICA pilot plant", for the continued development of an advanced PCC process, which will enable a reduction in the CO2 capture absorbent regeneration energy by 40% compared to the conventional MEA based process. The project team installed the pilot plant at the AGL Loy Yang power plant in Australia. The pilot plant has been commissioned and tested in a conventional MEA based process configuration and has commenced a 5,000 hour operating campaign using the IHI absorbent and the IHI optimized process configuration, and had achieved 1,800 hours of operationby mid September, 2016. The designed CO2 capture ratio of 90% has been achieved and stable plant operation has been confirmed. Continuous analysis will be kept for confirming the performance and robustness of the system. (C) 2017 Published by Elsevier Ltd.
引用
收藏
页码:1061 / 1068
页数:8
相关论文
共 50 条
  • [1] Performance evaluation of a coal-fired power plant
    Sharma, A.Kr. (avdhesh_sharma35@yahoo.co.in), 1600, RAMS Consultants (09):
  • [2] Advanced Exergoeconomic Evaluation of Large-Scale Coal-Fired Power Plant
    Wang, Ligang
    Fu, Peng
    Yang, Zhiping
    Lin, Tzu-En
    Yang, Yongping
    Tsatsaronis, George
    JOURNAL OF ENERGY ENGINEERING, 2020, 146 (01)
  • [3] Advanced coal-fired power plant uses digital network
    不详
    CONTROL ENGINEERING, 2006, 53 (09) : 32 - 32
  • [4] Research on evaluation method of coal-fired power plant boiler system efficiency
    He, Cheng-Bing
    Liu, Jing
    Gu, Yu-Jiong
    Meitan Xuebao/Journal of the China Coal Society, 2015, 40 (04): : 951 - 958
  • [5] Advanced coal-fired power plants
    Ruth, LA
    JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 2001, 123 (01): : 4 - 9
  • [6] Advanced coal-fired power generation
    Marshall, Tony
    Energy World, 1999, (265): : 12 - 15
  • [7] Modeling and Application of Coal Pulverizing System for Coal-fired Power Plant
    Yu, Tong
    Yuan, Jingqi
    RESOURCES AND SUSTAINABLE DEVELOPMENT, PTS 1-4, 2013, 734-737 : 2587 - 2591
  • [8] Evaluation of the radiological characterization in a coal-fired power plant, China
    You, Mu
    Hu, Yunhu
    Lu, Jun
    Li, Chaopin
    ENVIRONMENTAL PROGRESS & SUSTAINABLE ENERGY, 2015, 34 (04) : 1080 - 1084
  • [9] Pilot plant evaluation of PFS from coal-fired power plant waste
    Lloyd, Heath
    Cooper, Adrienne T.
    Fan, Maohong
    Brown, Robert C.
    Sawyer, John
    van Leeuwen, J.
    Shi, Yonghui
    Li, Na
    Zhang, Wei
    CHEMICAL ENGINEERING AND PROCESSING-PROCESS INTENSIFICATION, 2007, 46 (03) : 257 - 261
  • [10] Repowering a small coal-fired power plant
    Miell, Rick
    POWER ENGINEERING, 2007, 111 (11) : 24 - 24