Staff scheduling optimization in information technology projects

被引:0
|
作者
Filho, Amaury Brasil [1 ]
Marcal, Ana Sofia [1 ,2 ]
Costa, Gabriela [1 ,3 ]
Pinheiro, Placido [1 ]
机构
[1] Univ Fortaleza Grad Appl Comp Sci, BR-60811341 Fortaleza, Ceara, Brazil
[2] CESAR Recife Ctr Adv Syst & Studies, BR-50030390 Recife, PE, Brazil
[3] Atlantic Inst, BR-60822780 Fortaleza, Ceara, Brazil
来源
2007 INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT, VOLS 1-3 | 2007年
关键词
linear programming; multicriteria; project management;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
In an organization that develops Information Technology projects, often exists staff scheduling demands. In most of these organizations the resources are simultaneously shared between many projects. The organization has the responsibility of doing this optimized staff scheduling attending the projects demands. But, this is not a simple task to do and it turns more complex as the number of projects and professional increases. This paper proposes a mathematical programming model supported by multicriteria that will assist the Information Technology organization during the staff scheduling activity. The proposed model aims to optimize the demands of the professionals to the Information Technology projects.
引用
收藏
页码:312 / +
页数:3
相关论文
共 50 条
  • [31] Euro-information technology projects and products
    Rudall, BH
    ROBOTICA, 1997, 15 : 200 - 200
  • [32] Information Technology Projects - Leaving the 'Magic' to the 'Wizards'
    Bednar, Peter M.
    Welch, Christine
    INFORMATION SYSTEMS DEVELOPMENT: TOWARDS A SERVICE PROVISION SOCIETY, 2009, : 349 - +
  • [33] MEANS OF KNOWLEDGE SHARING IN INFORMATION TECHNOLOGY PROJECTS
    Mussi, Clarissa Carneiro
    Angeloni, Maria Terezinha
    REVISTA ELETRONICA DE ESTRATEGIA E NEGOCIOS-REEN, 2011, 4 (02): : 30 - 60
  • [34] A stochastic optimization approach for staff scheduling decisions at inpatient units
    Dehnoei, Sajjad
    Saure, Antoine
    Ozturk, Onur
    Gardner, William
    Pajer, Kathleen
    Sheppard, Roxanna
    Patrick, Jonathan
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2024, 31 (03) : 1762 - 1790
  • [35] Developing an Instrument to Assess Information Technology Staff Motivation
    Belfo, Fernando
    Sousa, Rui Dinis
    ENTERPRISE INFORMATION SYSTEMS, PT 2, 2011, 220 : 230 - +
  • [36] Multi-Objective Simultaneous Optimization for Linear Projects Scheduling
    Eid, Mohamed S.
    Elbeltagi, Emad E.
    El-Adaway, Islam H.
    COMPUTING IN CIVIL ENGINEERING 2019: VISUALIZATION, INFORMATION MODELING, AND SIMULATION, 2019, : 561 - 568
  • [37] Scheduling interdependent waterway projects through simulation and genetic optimization
    Wang, Shiaau-Lir
    Schonfeld, Paul
    J. Waterw. Port Coast. Ocean Eng., 1600, 3 (89-97):
  • [38] Linear Scheduling Optimization Model for Planning Repetitive Construction Projects
    Monghasemi, Shahryar
    Abdallah, Moatassem
    Clevenger, Caroline
    CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 1129 - 1138
  • [39] Scheduling interdependent waterway projects through simulation and genetic optimization
    Wang, SL
    Schonfeld, P
    JOURNAL OF WATERWAY PORT COASTAL AND OCEAN ENGINEERING, 2005, 131 (03) : 89 - 97
  • [40] Finding common ground for information technology staff and clinicians
    Byrne, Matthew D.
    CIN-COMPUTERS INFORMATICS NURSING, 2008, 26 (03) : 125 - 128