A heuristic approach to railway track maintenance scheduling

被引:32
|
作者
Quiroga, L. M. [1 ]
Schnieder, E. [1 ]
机构
[1] TU, Inst Traff Safety & Automat Technol, Braunschweig, Germany
关键词
track maintenance; heuristics; tamping; scheduling;
D O I
10.2495/CR100631
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Travelling safely and comfortably on high speed railway lines requires excellent conditions of the whole railway infrastructure in general and of the railway track geometry in particular. The maintenance process required to achieve such excellent conditions is largely complex and expensive, demanding an increased amount of both human and technical resources. In this framework, an optimal scheduling of maintenance interventions is an issue of increased relevance. In this work a method for optimization of the tamping scheduling is presented. It is based on a heuristic algorithm, which finds a very detailed tamping schedule where each planned intervention is fully specified. The algorithm tries to maximize an objective function, which is a quantitative expression of the maintenance process's objectives defined by the railway company. It first finds an upper bound for the objective function value, and then returns the best feasible solution found. The method is validated by means of a case study based on real data of the 240 km track of a French high speed TGV line. The results presented show that the value of the best solution found is very near to the upper bound (the difference is smaller than 1%), with a calculation time of under 1 second using a standard computer, so we think the heuristic has a great performance potential.
引用
收藏
页码:687 / 699
页数:13
相关论文
共 50 条
  • [1] A Heuristic Approach to the Railroad Track Maintenance Scheduling Problem
    Peng, Fan
    Kang, Seungmo
    Li, Xiaopeng
    Ouyang, Yanfeng
    Somani, Kamalesh
    Acharya, Dharma
    [J]. COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2011, 26 (02) : 129 - 145
  • [2] Optimal Scheduling of Track Maintenance on a Railway Network
    Zhang, Tao
    Andrews, John
    Wang, Rui
    [J]. QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2013, 29 (02) : 285 - 297
  • [3] Scheduling of railway track maintenance activities and crews
    Higgins, A
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1998, 49 (10) : 1026 - 1033
  • [4] Minimising costs in scheduling railway track maintenance
    Lake, M
    Ferreira, L
    Murray, M
    [J]. COMPUTERS IN RAILWAYS VII, 2000, 7 : 895 - 902
  • [5] A heuristic approach to integrate train timetabling, platforming, and railway network maintenance scheduling decisions
    Zhang, Qin
    Lusby, Richard Martin
    Shang, Pan
    Zhu, Xiaoning
    [J]. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2022, 158 : 210 - 238
  • [6] Optimal scheduling of track maintenance activities for railway networks
    Su, Zhou
    De Schutter, Bart
    [J]. IFAC PAPERSONLINE, 2018, 51 (09): : 386 - 391
  • [7] OPTIMIZING RAILWAY TRACK MAINTENANCE SCHEDULING TO MINIMIZE CIRCULATION IMPACTS
    Bueno, Paulo M. S.
    Vilela, Plinio R. S.
    Christofoletti, Luciano M.
    Vieira, Anderson P.
    [J]. PROCEEDINGS OF THE ASME JOINT RAIL CONFERENCE, 2019, 2019,
  • [8] A taxonomy of railway track maintenance planning and scheduling: A review and research trends
    Sedghi, Mahdieh
    Kauppila, Osmo
    Bergquist, Bjarne
    Vanhatalo, Erik
    Kulahci, Murat
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2021, 215
  • [9] Integrated condition-based track maintenance planning and crew scheduling of railway networks
    Su, Zhou
    Jamshidi, Ali
    Nunez, Alfredo
    Baldi, Simone
    De Schutter, Bart
    [J]. TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2019, 105 : 359 - 384
  • [10] Data-driven maintenance planning and scheduling based on predicted railway track condition
    Sedghi, Mahdieh
    Bergquist, Bjarne
    Vanhatalo, Erik
    Migdalas, Athanasios
    [J]. QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2022, 38 (07) : 3689 - 3709