A heuristic approach to railway track maintenance scheduling

被引:33
|
作者
Quiroga, L. M. [1 ]
Schnieder, E. [1 ]
机构
[1] TU, Inst Traff Safety & Automat Technol, Braunschweig, Germany
关键词
track maintenance; heuristics; tamping; scheduling;
D O I
10.2495/CR100631
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Travelling safely and comfortably on high speed railway lines requires excellent conditions of the whole railway infrastructure in general and of the railway track geometry in particular. The maintenance process required to achieve such excellent conditions is largely complex and expensive, demanding an increased amount of both human and technical resources. In this framework, an optimal scheduling of maintenance interventions is an issue of increased relevance. In this work a method for optimization of the tamping scheduling is presented. It is based on a heuristic algorithm, which finds a very detailed tamping schedule where each planned intervention is fully specified. The algorithm tries to maximize an objective function, which is a quantitative expression of the maintenance process's objectives defined by the railway company. It first finds an upper bound for the objective function value, and then returns the best feasible solution found. The method is validated by means of a case study based on real data of the 240 km track of a French high speed TGV line. The results presented show that the value of the best solution found is very near to the upper bound (the difference is smaller than 1%), with a calculation time of under 1 second using a standard computer, so we think the heuristic has a great performance potential.
引用
收藏
页码:687 / 699
页数:13
相关论文
共 50 条
  • [31] A tabu search heuristic for preventive maintenance scheduling
    Gopalakrishnan, M
    Mohan, S
    He, Z
    COMPUTERS & INDUSTRIAL ENGINEERING, 2001, 40 (1-2) : 149 - 160
  • [32] Prediction of Railway Track Condition for Preventive Maintenance by Using a Data-Driven Approach
    Vale, Cecilia
    Simoes, Maria Lurdes
    INFRASTRUCTURES, 2022, 7 (03)
  • [33] Heuristic and exact techniques for aircraft maintenance scheduling
    Chiesa, S.
    Quer, S.
    Corpino, S.
    Viola, N.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART G-JOURNAL OF AEROSPACE ENGINEERING, 2009, 223 (G7) : 989 - 999
  • [34] Track shifting technology for track maintenance of high-speed railway
    Xu, Lingyan
    Yuan, Wei
    Xie, Jian
    Xie, Haoran
    Zang, Chuanzhen
    Yue, Tong
    Journal of Railway Science and Engineering, 2024, 21 (07) : 2557 - 2568
  • [35] A heuristic approach to bicriteria scheduling
    Köksalan, MM
    NAVAL RESEARCH LOGISTICS, 1999, 46 (07) : 777 - 789
  • [36] Heuristic approach for forecast scheduling
    Zaaraoui, Hind
    Altman, Zwi
    Ben Jemaa, Sana
    Altman, Eitan
    Jimenez, Tania
    2018 IEEE WIRELESS COMMUNICATIONS AND NETWORKING CONFERENCE WORKSHOPS (WCNCW), 2018, : 31 - 36
  • [37] Bayesian heuristic approach to scheduling
    Mockus, J
    INFORMATICA, 2002, 13 (03) : 311 - 332
  • [38] A heuristic approach for a scheduling problem with periodic maintenance and sequence-dependent setup times
    Angel-Bello, Francisco
    Alvarez, Ada
    Pacheco, Joaquin
    Martinez, Iris
    COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2011, 61 (04) : 797 - 808
  • [39] A railway maintenance scheduling problem with customer costs
    Heinicke, Franziska
    Simroth, Axel
    Scheithauer, Guntram
    Fischer, Andreas
    EURO JOURNAL ON TRANSPORTATION AND LOGISTICS, 2015, 4 (01) : 113 - 137
  • [40] Integral optimization model for scheduling railway maintenance
    Guo, Ran
    Han, Bao-Ming
    Wang, Fu-Tian
    Jiaotong Yunshu Xitong Gongcheng Yu Xinxi/Journal of Transportation Systems Engineering and Information Technology, 2013, 13 (04): : 149 - 156