Optimal multi-class job scheduling on a single machine with sequence-dependent set-up and variable processing times

被引:0
|
作者
Giglio, D [1 ]
Minciardi, R [1 ]
机构
[1] Univ Genoa, Dipartimento Informat Sistemist & Telemat, I-16145 Genoa, Italy
关键词
D O I
10.1109/CDC.2004.1429310
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The scheduling of jobs belonging to different classes over a single machine is considered in this paper. The processing time of any job of a given class is a continuous variable whose value ranges from a lower bound up to a higher bound, corresponding to the nominal processing time. The switch from a job of a class to a job of another class requires a sequence-dependent set-up. The cost function to be minimized in the scheduling problem takes into account the overall job tardiness, the sum of the costs due to the deviation of the actual processing time from the nominal value, and the set-up costs. The decision variables are those concerning job sequencing and execution times. In the paper, a solution to this problem - in terms of optimal control strategies - is provided.
引用
收藏
页码:3680 / 3683
页数:4
相关论文
共 50 条
  • [21] Controlled order release: a performance assessment in job shops with sequence-dependent set-up times
    Thuerer, Matthias
    Silva, Cristovao
    Stevenson, Mark
    Land, Martin
    PRODUCTION PLANNING & CONTROL, 2014, 25 (07) : 603 - 615
  • [22] The single machine scheduling problem with sequence-dependent setup times and a learning effect on processing times
    Mustu, Settar
    Eren, Tamer
    APPLIED SOFT COMPUTING, 2018, 71 : 291 - 306
  • [23] Constrained scheduling of the inspection activities on semiconductor wafers grouped in families with sequence-dependent set-up times
    Giovanni Celano
    Antonio Costa
    Sergio Fichera
    The International Journal of Advanced Manufacturing Technology, 2010, 46 : 695 - 705
  • [24] Metaheuristics for the multi-objective FJSP with sequence-dependent set-up times, auxiliary resources and machine down time
    Jacomine Grobler
    Andries P. Engelbrecht
    Schalk Kok
    Sarma Yadavalli
    Annals of Operations Research, 2010, 180 : 165 - 196
  • [25] Constrained scheduling of the inspection activities on semiconductor wafers grouped in families with sequence-dependent set-up times
    Celano, Giovanni
    Costa, Antonio
    Fichera, Sergio
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 46 (5-8): : 695 - 705
  • [26] On some single-machine scheduling with sequences-dependent set-up times
    Zhang, L
    Zheng, WM
    INFORMATION INTELLIGENCE AND SYSTEMS, VOLS 1-4, 1996, : 1162 - 1165
  • [27] Minimising makespan in flowshop group scheduling with sequence-dependent family set-up times using inserted idle times
    Neufeld, J. S.
    Gupta, J. N. D.
    Buscher, U.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (06) : 1791 - 1806
  • [28] The job sequencing and tool switching problem with sequence-dependent set-up time
    Tri Windras Mara S.
    Sutoyo E.
    Norcahyo R.
    Pratama Rifai A.
    Journal of King Saud University - Engineering Sciences, 2023, 35 (01) : 53 - 61
  • [29] Robust scheduling of parallel. machines with sequence-dependent set-up costs
    Anglani, A
    Grieco, A
    Guerriero, E
    Musmanno, R
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 161 (03) : 704 - 720
  • [30] Metaheuristics for the multi-objective FJS']JSP with sequence-dependent set-up times, auxiliary resources and machine down time
    Grobler, Jacomine
    Engelbrecht, Andries P.
    Kok, Schalk
    Yadavalli, Sarma
    ANNALS OF OPERATIONS RESEARCH, 2010, 180 (01) : 165 - 196