共 50 条
- [32] Application of the Bootstrap Method on a Large Input Data Set - Case study on the Western Part of the Sava Depression RUDARSKO-GEOLOSKO-NAFTNI ZBORNIK, 2021, 36 (05): : 13 - 19
- [33] Analysis of the Ship Monitoring System - A Case Study for Constanta Port (Part 1) ADVANCES IN MARITIME AND NAVAL SCIENCE AND ENGINEERING, 2010, : 61 - 66
- [35] Process monitoring in principal component subspace: Part 1. Fault reconstruction study 2004 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN & CYBERNETICS, VOLS 1-7, 2004, : 5119 - 5124
- [36] Sheet metal forming in the case of hinge manufacturing process. Part 2: Numerical study INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2018, 95 (1-4): : 367 - 374
- [37] Sheet metal forming in the case of hinge manufacturing process. Part 2: Numerical study The International Journal of Advanced Manufacturing Technology, 2018, 95 : 367 - 374
- [39] THE COOPERATION BETWEEN ENTERPRISES: SIGNIFICANT PART OF THE INNOVATION PROCESS - A CASE STUDY OF THE CZECH MACHINERY INDUSTRY E & M EKONOMIE A MANAGEMENT, 2016, 19 (03): : 110 - 122
- [40] THE CASE OF MITSUI MAIN BUILDING BLOCK REDEVELOPMENT PROJECT PART 3: THE FAÇADE DESIGN PROCESS OF THE TOWER PART IN NIHONBASHI MITSUI TOWER 1 AIJ Journal of Technology and Design, 2023, 29 (72): : 993 - 998