Finsch Diamond Mine, part of De Beers Consolidated Mines (DBCM), is situated between Kimberley and Postmasburg in the Northern Cape, South Africa. The kimberlite pipe was discovered in 1960 and De Beers assumed full mining rights three years later. Production commenced in 1966 from an opencast mine, and the operation moved underground in 1990 by developing and implementing a new mining method of blast hole open stoping. A mechanized block cave was brought into production in 2005. While block caving was not new to DBCM, with productive caves having operated in Kimberley and Cullinan, from the outset, the Finsch caving operation was designed as the most advanced with a semi-automated ground handling system. The extraction level was laid out as a single sided herringbone system due to the very poor ground conditions on the south side of the pipe. These factors combined to create a unique environment, which necessitated a completely new approach to draw control. The required system was developed by a team consisting of DBCM personnel from head office and Finsch, GEMCOM and Sandvik-Tamrock, the equipment manufacturers. It was essential that the system could be run quickly, provide daily updates and issue calls directly to the LHDs. it was also important that the base data were obtained from the resource model, which was to be depleted on a monthly basis, thus forming a close link between mine planning and draw control. A further requirement of the system was that it would form a central database for the extraction operation where all data pertaining to delays and changes in conditions, be they production or ground condition related, could be recorded and analysed. The design brought together empirical rules and tables developed at Cullinan plus concepts from programming developed for the front cave at Koffiefontein so that the new system was based on sound practical experience. These facets were incorporated into PCBC (GEMCOM) and CMS and PCS (Sandvik-Tamrock programmes). The system has now been operational for just under a year and while modifications have had to be made, it has proved itself as a practical and reliable tool with which to manage the draw control at Finsch. The system is unforgiving and has forced the production team to focus on the specified drawpoints. Problems have been encountered but most of these have been related to re-educating a workforce, familiar with a flexible mining method, to the strict discipline required for a modem block cave.
引用
收藏
页码:775 / 781
页数:7
相关论文
共 50 条
  • [21] Investigation of Gas and Airflow Distribution in a Block Cave Mine
    Yong Pan
    Purushotham Tukkaraja
    Srivatsan Jayaraman Sridharan
    Mining, Metallurgy & Exploration, 2022, 39 : 1821 - 1832
  • [22] Sublevel cave propagation at Mount Marion gold mine
    Parsons, S.
    Hall, E.
    Hucker, P.
    EXPLO 2007 BLASTING: TECHNIQUES AND TECHNOLOGY, PROCEEDINGS, 2007, 2007 (07): : 129 - +
  • [23] The CCUT block cave design for Cullinan Diamond Mine
    Tukker, H.
    Holder, A.
    Swarts, B.
    van Strijp, T.
    Grobler, E.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2016, 116 (08) : 715 - 722
  • [24] Investigation of Gas and Airflow Distribution in a Block Cave Mine
    Pan, Yong
    Tukkaraja, Purushotham
    Sridharan, Srivatsan Jayaraman
    MINING METALLURGY & EXPLORATION, 2022, 39 (04) : 1821 - 1832
  • [25] Secondary breakage practice at the DOZ block cave mine
    Flint, D. C.
    Sinuhaji, A.
    Setyoko, T. B.
    Kalangi, H.
    9TH AUSIMM UNDERGROUND OPERATORS CONFERENCE 2005, 2005, 2005 (01): : 53 - 56
  • [26] An update on cave development and draw control at the Henderson mine
    Rech, W
    Keskimaki, KW
    Stewart, DS
    MASSMIN 2000, PROCEEDINGS, 2000, 2000 (07): : 495 - 505
  • [27] Airflow characteristic curves for a mature block cave mine
    Bhargava, R.
    Tukkaraja, P.
    Adhikari, A.
    Sridharan, S. J.
    Vytla, V. V. S.
    MINE VENTILATION, NAMVS 2021, 2021, : 56 - 64
  • [28] Geotechnical inputs for cave management in the DOZ block cave
    Sahupala, H. A.
    Srikant, A.
    ROCK MECHANICS: MEETING SOCIETY'S CHALLENGES AND DEMANDS, VOLS 1 AND 2: VOL: FUNDAMENTALS, NEW TECHNOLOGIES & NEW IDEAS; VOL 2: CASE HISTORIES, 2007, : 1313 - 1320
  • [29] Integration of the mining plan in a mining automation system using state-of-the-art technology at De Beers Finsch Mine
    Burger, D. J.
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 2006, 106 (08): : 553 - 559
  • [30] MINE MANAGEMENT
    WILES, GM
    TRANSACTIONS OF THE SOCIETY OF MINING ENGINEERS OF AIME, 1962, 223 (02): : 192 - 196