Optimizing bi-objective redundancy allocation problem with a mixed redundancy strategy

被引:63
|
作者
Ardakan, Mostafa Abouei [1 ]
Hamadani, Ali Zeinal [1 ]
Alinaghian, Mehdi [1 ]
机构
[1] Isfahan Univ Technol, Dept Ind & Syst Engn, Esfahan 8415683111, Iran
关键词
Multi-objective reliability optimization; Redundancy allocation problem; Mixed redundancy strategy; NSGA-Il; SERIES-PARALLEL SYSTEMS; RELIABILITY OPTIMIZATION; MULTIOBJECTIVE OPTIMIZATION; ALGORITHM; CHOICE; SEARCH; CONSTRAINT; MODEL;
D O I
10.1016/j.isatra.2014.10.002
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Redundancy Allocation Problem (RAP) is a challenging subject which has attracted the attention of many authors. Generally, in the RAP there are two strategies for using the redundant components: active and standby. In this paper a new redundancy strategy, called mixed redundancy, is introduced and considered in a multi-objective optimization RAP. Results demonstrate that the new strategy increases the reliability value of the system considerably. This improvement can be very important for system designers, because the reliability of any systems with the structure of redundant components can be increased by changing the redundancy strategy, not by only adding redundant component. Moreover, this improvement dose not increases the cost and other known physical characteristics of the system. (C) 2014 ISA. Published by Elsevier Ltd. All rights reserved.
引用
收藏
页码:116 / 128
页数:13
相关论文
共 50 条
  • [31] A New Nonlinear Multi-objective Redundancy Allocation Model with the Choice of Redundancy Strategy Solved by Compromise Programming Approach
    Sadjadi, S. J.
    Tofigh, A. A.
    Soltani, R.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2014, 27 (04): : 545 - 552
  • [32] A bi-objective model for nursing home location and allocation problem
    Wang, Shijin
    Ma, Shuan
    Li, Bin
    Li, Xue
    2016 13TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT, 2016,
  • [33] Research on uncertain bi-objective UAV mission allocation problem
    Zhang, Lisheng
    Zheng, Mingfa
    Zhong, Haitao
    Zheng, Aoyu
    EVOLUTIONARY INTELLIGENCE, 2024, 17 (01) : 229 - 237
  • [34] A bat algorithm for the redundancy allocation problem
    Talafuse, T. P.
    Pohl, E. A.
    ENGINEERING OPTIMIZATION, 2016, 48 (05) : 900 - 910
  • [35] Multi-objective redundancy allocation problem for a system with repairable components considering instantaneous availability and strategy selection
    Kayedpour, Farjam
    Amiri, Maghsoud
    Rafizadeh, Mahmoud
    Nia, Arash Shahryari
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2017, 160 : 11 - 20
  • [36] A robust loss function approach for a multi-objective redundancy allocation problem
    Salmasnia, Ali
    Ameri, Ehsan
    Niaki, Seyed Taghi Akhavan
    APPLIED MATHEMATICAL MODELLING, 2016, 40 (01) : 635 - 645
  • [37] Optimizing a Bi-objective Vehicle Routing Problem Appearing in Industrial Enterprises
    Lopez-Sanchez, Ana D.
    Hernandez-Diaz, Alfredo G.
    Molina, Julian
    Laguna, Manuel
    14TH INTERNATIONAL CONFERENCE ON SOFT COMPUTING MODELS IN INDUSTRIAL AND ENVIRONMENTAL APPLICATIONS (SOCO 2019), 2020, 950 : 452 - 462
  • [38] A multi-objective reliability-redundancy allocation problem with active redundancy and interval type-2 fuzzy parameters
    Kundu, Pradip
    OPERATIONAL RESEARCH, 2021, 21 (04) : 2433 - 2458
  • [39] An efficient simulated annealing algorithm for the redundancy allocation problem with a choice of redundancy strategies
    Chambari, Amirhossain
    Najafi, Amir Abbas
    Rahmati, Seyed Habib A.
    Karimi, Aida
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2013, 119 : 158 - 164
  • [40] A multi-objective reliability-redundancy allocation problem with active redundancy and interval type-2 fuzzy parameters
    Pradip Kundu
    Operational Research, 2021, 21 : 2433 - 2458