共 33 条
- [6] A Sequential Optimization Model of Cut-off Grade and Project/Location Selection in Open Pit Mining [J]. INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2019, 18 (03): : 369 - 382
- [7] A Cut-Off Grade Optimization Model in the Open Pit Mining Considering Reclamation and Valuable Waste Materials [J]. 2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 45 - 49
- [8] The effect of price changes on optimum cut-off grade of different open-pit mines [J]. JOURNAL OF MINING AND ENVIRONMENT, 2012, 3 (01): : 61 - 68
- [10] An environmental oriented model for optimum cut-off grades in open pit mining projects to minimize acid mine drainage [J]. International Journal of Environmental Science & Technology, 2008, 5 : 183 - 194