Net present value maximization model for optimum cut-off grade policy of open pit mining operations

被引:0
|
作者
Asad, M. W. A. [1 ]
Topal, E. [2 ]
机构
[1] McGill Univ, Montreal, PQ H3A 2T5, Canada
[2] Curtin Univ Technol, Western Australia Sch Mines, Perth, WA 6845, Australia
关键词
mining; modelling; cut-off grade; stockpiling; optimization;
D O I
暂无
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
The optimum cut-off grade policy maximizes the net present value (NPV) of an open pit mining operation subject to the mining, processing, and refining capacity constraints. The traditional approaches to cut-off grade determination ignore the escalation of the economic parameters such as metal price and operating costs during life of an operation, and consequently lead to unrealistically higher values of the objective function. Further, the NPV of a mining operation declines due to the depletion of the available reserves, causing a decline in the optimum cut-off grade, i.e. higher cut-off grades in the early years of an operation and lower cut-off grades during the later years. Hence, low grade material mined in the earlier years may be stockpiled for processing during later years to offset the effect of escalating economic parameters on NPV. This paper demonstrates the combined impact of introducing economic parameters, escalation and stockpiling options into the cut-off grade optimization model. The model promises an enhancement in NPV as illustrated in a case study incorporating practical aspects of an open pit mining operation.
引用
收藏
页码:741 / 750
页数:10
相关论文
共 33 条