共 28 条
- [4] Optimization of Cut-off Grades for Molybdenum and Tungsten Open-pit Mines [J]. PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON SUSTAINABLE DEVELOPMENT IN THE MINERALS INDUSTRY (SDIMI 2017), 2017, 2 : 18 - 23
- [5] A Sequential Optimization Model of Cut-off Grade and Project/Location Selection in Open Pit Mining [J]. INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2019, 18 (03): : 369 - 382
- [9] A Cut-Off Grade Optimization Model in the Open Pit Mining Considering Reclamation and Valuable Waste Materials [J]. 2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 45 - 49
- [10] A new approach to constrained open pit pushback design using dynamic cut-off grades [J]. Journal of Mining Science, 2014, 50 : 733 - 744