共 34 条
- [5] A Sequential Optimization Model of Cut-off Grade and Project/Location Selection in Open Pit Mining [J]. INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2019, 18 (03): : 369 - 382
- [8] A Cut-Off Grade Optimization Model in the Open Pit Mining Considering Reclamation and Valuable Waste Materials [J]. 2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 45 - 49