Flow Shop Scheduling Problem with Limited Buffer Based on Hybrid Shuffled Frog Leaping Algorithm

被引:0
|
作者
Liang, Xu [1 ]
Wang, Peixuan [1 ]
Huang, Ming [1 ]
机构
[1] Dalian Jiaotong Univ, Software Inst, Dalian, Peoples R China
关键词
Limited buffer flow shop scheduling; Shuffled frog leaping algorithm; Local search; DE-BASED ALGORITHM; SEARCH; MAKESPAN;
D O I
10.1109/iccsnt47585.2019.8962427
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Aiming at the flow shop scheduling problem with limited buffer, a hybrid shuffled frog-leaping algorithm (HSFLA) combining variable neighborhood search (VNS) and frog-leaping algorithm (SFLA) is proposed to minimize the makespan. To improve the quality of the initial solutions, a partial initial population is generated using the NEH algorithm and iterative greedy (IG). In order to avoid the problem of the original algorithm's premature convergence and producing infeasible solutions, the adaptive moving operator is introduced to improve the step size and crossover operator in the sub-population's updating part. A variable neighborhood search method based on three neighborhood structures is designed to enhance the local optimization ability of the algorithm. The performances of HSFLA were evaluated over car and rec benchmark problems. The computational results demonstrated that HSFLA has an effective performance for the flow shop scheduling problem with limited buffer.
引用
收藏
页码:87 / 93
页数:7
相关论文
共 50 条
  • [41] The Hybrid Shuffle Frog Leaping Algorithm Based on Cuckoo Search for Flow Shop Scheduling with the Consideration of Energy Consumption
    Zhong, Ling-Chong
    Qian, Bin
    Hu, Rong
    Zhang, Chang-Sheng
    INTELLIGENT COMPUTING THEORIES AND APPLICATION, PT I, 2018, 10954 : 649 - 658
  • [42] Elitism based Shuffled Frog Leaping Algorithm
    Sharma, Pragya
    Sharma, Nirmala
    Sharma, Harish
    2016 INTERNATIONAL CONFERENCE ON ADVANCES IN COMPUTING, COMMUNICATIONS AND INFORMATICS (ICACCI), 2016, : 788 - 794
  • [43] Performance of Shuffled Frog-Leaping Algorithm in Finance-Based Scheduling
    Alghazi, Anas
    Selim, Shokri Z.
    Elazouni, Ashraf
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2012, 26 (03) : 396 - 408
  • [44] Shuffled Frog-leaping Algorithm Based Batch Scheduling in Semiconductor Furnace
    Xu, Ye
    Wang, Ling
    Wang, Sheng-Yao
    Deng, Jin
    2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 2717 - 2722
  • [45] Solving a bi-criteria permutation flow-shop problem using shuffled frog-leaping algorithm
    Rahimi-Vahed, Alireza
    Mirzaei, Ali Hossein
    SOFT COMPUTING, 2008, 12 (05) : 435 - 452
  • [46] Solving a bi-criteria permutation flow-shop problem using shuffled frog-leaping algorithm
    Alireza Rahimi-Vahed
    Ali Hossein Mirzaei
    Soft Computing, 2008, 12 : 435 - 452
  • [47] Cloud-Based Advanced Shuffled Frog Leaping Algorithm for Tasks Scheduling
    Kumar, Dipesh
    Mandal, Nirupama
    Kumar, Yugal
    BIG DATA, 2024, 12 (02) : 110 - 126
  • [48] Shuffled Frog Leaping Algorithm for a Bi-objective No-idle Permutation Flow Shop
    Wang, Yamin
    Li, Xiaoping
    2013 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC 2013), 2013, : 2808 - 2813
  • [49] Shuffled Frog Leaping Algorithm Based Optimal Reactive Power Flow
    Li, Qingzheng
    2009 INTERNATIONAL SYMPOSIUM ON COMPUTER NETWORK AND MULTIMEDIA TECHNOLOGY (CNMT 2009), VOLUMES 1 AND 2, 2009, : 588 - 591
  • [50] A Novel Shuffled Frog-Leaping Algorithm for Flexible Job Shop Scheduling with Interval Processing Time
    Lei, Deming
    Cao, Sanqiang
    PROCEEDINGS OF THE 36TH CHINESE CONTROL CONFERENCE (CCC 2017), 2017, : 2708 - 2713