Flow Shop Scheduling Problem with Limited Buffer Based on Hybrid Shuffled Frog Leaping Algorithm

被引:0
|
作者
Liang, Xu [1 ]
Wang, Peixuan [1 ]
Huang, Ming [1 ]
机构
[1] Dalian Jiaotong Univ, Software Inst, Dalian, Peoples R China
关键词
Limited buffer flow shop scheduling; Shuffled frog leaping algorithm; Local search; DE-BASED ALGORITHM; SEARCH; MAKESPAN;
D O I
10.1109/iccsnt47585.2019.8962427
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Aiming at the flow shop scheduling problem with limited buffer, a hybrid shuffled frog-leaping algorithm (HSFLA) combining variable neighborhood search (VNS) and frog-leaping algorithm (SFLA) is proposed to minimize the makespan. To improve the quality of the initial solutions, a partial initial population is generated using the NEH algorithm and iterative greedy (IG). In order to avoid the problem of the original algorithm's premature convergence and producing infeasible solutions, the adaptive moving operator is introduced to improve the step size and crossover operator in the sub-population's updating part. A variable neighborhood search method based on three neighborhood structures is designed to enhance the local optimization ability of the algorithm. The performances of HSFLA were evaluated over car and rec benchmark problems. The computational results demonstrated that HSFLA has an effective performance for the flow shop scheduling problem with limited buffer.
引用
收藏
页码:87 / 93
页数:7
相关论文
共 50 条
  • [21] Job-Shop Scheduling Using Hybrid Shuffled Frog Leaping
    Ahandani, M. Alinia
    Shirjoposht, N. Pourqorban
    Banimand, R.
    2009 14TH INTERNATIONAL COMPUTER CONFERENCE, 2009, : 669 - +
  • [22] An Effective Shuffled Frog-leaping Algorithm for the Flexible Job-shop Scheduling Problem
    Xu, Ye
    Wang, Ling
    Wang, Shengyao
    PROCEEDINGS OF THE 2013 IEEE SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE IN CONTROL AND AUTOMATION (CICA), 2013, : 128 - 134
  • [23] An improved shuffled frog leaping algorithm and its application in permutation flow shop scheduling problem in machine fault conditions
    Li, Yueguang
    PROCEEDINGS OF THE 2015 INTERNATIONAL SYMPOSIUM ON COMPUTERS & INFORMATICS, 2015, 13 : 983 - 990
  • [24] A Shuffled Frog-Leaping Algorithm with Cooperations for Distributed Assembly Hybrid-Flow Shop Scheduling with Factory Eligibility
    Lei, Deming
    Dai, Tao
    SYMMETRY-BASEL, 2023, 15 (04):
  • [25] A shuffled frog-leaping algorithm with memeplex quality for bi-objective distributed scheduling in hybrid flow shop
    Cai, Jingcao
    Lei, Deming
    Li, Ming
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (18) : 5404 - 5421
  • [26] A novel hybrid multi-objective shuffled frog-leaping algorithm for a bi-criteria permutation flow shop scheduling problem
    Rahimi-Vahed, Alireza
    Dangchi, Mostafa
    Rafiei, Hamed
    Salimi, Ehsan
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 41 (11-12): : 1227 - 1239
  • [27] A novel hybrid multi-objective shuffled frog-leaping algorithm for a bi-criteria permutation flow shop scheduling problem
    Rahimi-Vahed, Alireza
    Dangchi, Mostafa
    Rafiei, Hamed
    Salimi, Ehsan
    International Journal of Advanced Manufacturing Technology, 2009, 41 (11-12): : 1227 - 1239
  • [28] A novel hybrid multi-objective shuffled frog-leaping algorithm for a bi-criteria permutation flow shop scheduling problem
    Alireza Rahimi-Vahed
    Mostafa Dangchi
    Hamed Rafiei
    Ehsan Salimi
    The International Journal of Advanced Manufacturing Technology, 2009, 41 : 1227 - 1239
  • [29] A shuffled frog-leaping algorithm for job shop scheduling with outsourcing options
    Lei, Deming
    Guo, Xiuping
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (16) : 4793 - 4804
  • [30] Shuffled frog leaping algorithm approach to employee timetabling and job shop scheduling
    Ramya, G.
    Chandrasekaran, M.
    International Journal of Internet Manufacturing and Services, 2014, 3 (03) : 178 - 203