共 50 条
- [21] Investigating the Human Errors in 4D BIM Construction Scheduling [J]. CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 750 - 757
- [22] 4D approach for urban tunnelling in a BIM environment [J]. APPLIED GEOMATICS, 2023, 15 (02) : 337 - 347
- [23] 4D approach for urban tunnelling in a BIM environment [J]. Applied Geomatics, 2023, 15 : 337 - 347
- [24] Research on 4D Simulation Technology of Reconstruction Engineering Construction Organization Based on BIM [J]. 2020 2ND GLOBAL CONFERENCE ON ECOLOGICAL ENVIRONMENT AND CIVIL ENGINEERING, 2020, 568