As part of Shippensburg University's sustainability plan, its existing 60-year-old central coal-fired heating plant generating 70,000 lb/h (19 900 kW) of steam at peak demand was replaced with a new decentralized hot water heating system. A prior study with four potential configurations for the utility system was conducted. Technical and economic analyses, qualitative advantages and disadvantages were compared.
引用
收藏
页码:88 / 91
页数:4
相关论文
共 50 条
  • [21] Lessons Learned From the Blackout Accident at a Nuclear Power Plant in Taiwan
    Lee, Chien-Hsing
    Chen, Bin-Kwie
    Chen, Nan-Ming
    Liu, Chih-Wen
    IEEE TRANSACTIONS ON POWER DELIVERY, 2010, 25 (04) : 2726 - 2733
  • [22] Lessons learned from the Fukushima Daiichi Nuclear Power Plant accident
    Narabayashi, T.
    THMT-12. PROCEEDINGS OF THE SEVENTH INTERNATIONAL SYMPOSIUM ON TURBULENCE, HEAT AND MASS TRANSFER, 2012, : 49 - 60
  • [23] Lessons learned from the failure of a bituminous surface treatment in central Oregon
    Bolander, Peter
    Chitwood, Lawrence A.
    Steele, H. Michael
    Transportation Research Record, 1999, 2 (1652): : 51 - 58
  • [24] Lessons learned from the failure of a bituminous surface treatment in central Oregon
    Bolander, P
    Chitwood, LA
    Steele, HM
    SEVENTH INTERNATIONAL CONFERENCE ON LOW-VOLUME ROADS 1999, VOL 2: PLANNING, ADMINISTRATION, AND ENVIRONMENT; DESIGN; MATERIALS, CONSTRUCTION, AND MAINTENANCE; OPERATIONS AND SAFETY, 1999, (1652): : 51 - 58
  • [25] International transfer of ideas in 'qualitics': lessons learned from central Europe
    Nizankowski, R
    INTERNATIONAL JOURNAL FOR QUALITY IN HEALTH CARE, 1998, 10 (04) : 291 - 293
  • [26] Comparison and lessons learned from plant specific PSA of German NPP
    Balfanz, HP
    Berg, HP
    Steininger, U
    PSAM 5: PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOLS 1-4, 2000, (34): : 551 - 558
  • [27] Lessons learned from analyzing an explosion at Shanghai SECCO petrochemical plant
    Dong, Hanhai
    Liu, Yi
    Zhao, Dongfeng
    Qi, Meng
    Chen, Jian
    Wang, Yanchun
    Wang, Wei
    PROCESS SAFETY PROGRESS, 2020, 39 (01)
  • [28] Experiences and lessons learned from the End-of-Substructure card production of the ATLAS ITk Strip upgrade
    Bauckhage, L.
    Boebel, A. L.
    Ceslik, H.
    Dam, M.
    da Silva, A.
    Cornell, S. Diez
    Garvey, C. M.
    Gotfredsen, R. S.
    Goettlicher, P.
    Gregor, I. M.
    Keaveney, J. M.
    Palmelund, A.
    Daza, S. Ruiz
    Schmitt, S.
    Stanitzki, M.
    Strom, L. R.
    JOURNAL OF INSTRUMENTATION, 2025, 20 (02):
  • [29] Lessons learned with iron fortification in Central America
    Dary, O
    NUTRITION REVIEWS, 2002, 60 (07) : S30 - S33
  • [30] Plant Revamps and Turnarounds: Some Lessons Learned
    Lenfeld, Petr
    Buttridge, Ian
    CHEMICAL ENGINEERING, 2013, 120 (12) : 45 - 50