Capacitated lot sizing with parallel machines, sequence-dependent setups, and a common setup operator

被引:24
|
作者
Tempelmeier, Horst [1 ]
Copil, Karina [1 ]
机构
[1] Univ Cologne, Dept Supply Chain Management & Prod, Cologne, Germany
关键词
Lotsizing; Setup operator; Shelf life; Parallel machines; TIMES; RESOURCES; WINDOWS;
D O I
10.1007/s00291-015-0410-2
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we consider a special variant of a capacitated dynamic lot sizing problem which, despite its practical relevance, has not been treated sufficiently in the literature. In addition to the significant complexity introduced by the sequence dependency of setup times, the problem is further complicated by the fact that there is only one single setup operator which is responsible for all setups on all machines. Hence, the multi-machine problem cannot be decomposed into multiple single machine problems, as the setup operations must be coordinated among the different machines. In addition, lots are produced in batches whereby the processing time of a lot is a step-wise function of the number of batches per lot. Due to perishability and quarantine issues, time windows for the production are given. We formulate a big-bucket lot sizing model and apply MIP-based heuristics to two industrial data sets.
引用
收藏
页码:819 / 847
页数:29
相关论文
共 50 条
  • [31] Parallel Machines Scheduling with Sequence-Dependent Setup Times Constraints
    Hu, Dayong
    Yao, Zhenqiang
    ADVANCED SCIENCE LETTERS, 2011, 4 (6-7) : 2528 - 2531
  • [32] Scheduling unrelated parallel machines with sequence-dependent setup times
    Javad Rezaeian Zeidi
    Samir MohammadHosseini
    The International Journal of Advanced Manufacturing Technology, 2015, 81 : 1487 - 1496
  • [33] Three-Phase Method for the Capacitated Lot-Sizing Problem with Sequence Dependent Setups
    Larroche, Francois
    Bellenguez, Odile
    Massonnet, Guillaume
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: ARTIFICIAL INTELLIGENCE FOR SUSTAINABLE AND RESILIENT PRODUCTION SYSTEMS, APMS 2021, PT II, 2021, 631 : 694 - 702
  • [34] THE CYCLIC LOT SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUPS
    DOBSON, G
    OPERATIONS RESEARCH, 1992, 40 (04) : 736 - 749
  • [35] Solving a parallel-line capacitated lot-sizing and scheduling problem with sequence-dependent setup time/cost and preventive maintenance by a rolling horizon method
    Alimian, Mahyar
    Ghezavati, Vahidreza
    Tavakkoli-Moghaddam, Reza
    Ramezanian, Reza
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 168
  • [36] Valid inequalities and extended formulations for lot-sizing and scheduling problem with sequence-dependent setups
    Lee, Younsoo
    Lee, Kyungsik
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 310 (01) : 201 - 216
  • [37] CAPACITATED LOT SIZING WITH SETUP TIMES
    TRIGEIRO, WW
    THOMAS, LJ
    MCCLAIN, JO
    MANAGEMENT SCIENCE, 1989, 35 (03) : 353 - 366
  • [38] Production lot sizing and scheduling with non-triangular sequence-dependent setup times
    Clark, Alistair
    Mahdieh, Masoumeh
    Rangel, Socorro
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (08) : 2490 - 2503
  • [39] Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities
    Haase, K
    Kimms, A
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2000, 66 (02) : 159 - 169
  • [40] Scheduling jobs on dynamic parallel machines with sequence-dependent setup times
    Zne-Jung Lee
    Shih-Wei Lin
    Kuo-Ching Ying
    The International Journal of Advanced Manufacturing Technology, 2010, 47 : 773 - 781