Approximate policy iteration for dynamic resource-constrained project scheduling

被引:6
|
作者
Parizi, Mahshid Salemi [1 ]
Gocgun, Yasin [2 ]
Ghate, Archis [1 ]
机构
[1] Univ Washington, Ind & Syst Engn, BOX 352650, Seattle, WA 98195 USA
[2] Altinbas Univ, Dept Ind Engn, Istanbul, Turkey
关键词
Markov decision processes; Approximate dynamic programming; Queueing;
D O I
10.1016/j.orl.2017.06.002
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We study non-preemptive scheduling problems where heterogeneous projects stochastically arrive over time. The projects include precedence-constrained tasks that require multiple resources. Incomplete projects are held in queues. When a queue is full, an arriving project must be rejected. The goal is to choose which tasks to start in each time-slot to maximize the infinite-horizon discounted expected profit. We provide a weakly coupled Markov decision process (MDP) formulation and apply a simulation-based approximate policy iteration method. Extensive numerical results are presented. (C) 2017 Elsevier B.V. All rights reserved.
引用
收藏
页码:442 / 447
页数:6
相关论文
共 50 条
  • [21] Resource-Constrained Project Scheduling in Hazardous Environment
    Li, Shuai
    Zhang, Zhicong
    Hu, Kaishun
    Zhao, Shaoyong
    Yan, Xiaohui
    2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 2266 - 2270
  • [22] An evolutionary algorithm for resource-constrained project scheduling
    Hindi, KS
    Yang, HB
    Fleszar, K
    IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (05) : 512 - 518
  • [23] Resource-constrained project scheduling by simulated annealing
    Boctor, FF
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (08) : 2335 - 2351
  • [24] A simulation-based approximate dynamic programming approach to dynamic and stochastic resource-constrained multi-project scheduling problem
    Satic, U.
    Jacko, P.
    Kirkbride, C.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 315 (02) : 454 - 469
  • [25] Flexible Scheduling Approach for Resource-Constrained Project Scheduling Problems
    Liu, Shixin
    Tukel, Oya I.
    Rom, W.
    2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 3522 - +
  • [26] Multidirectional Scheduling Scheme in Resource-Constrained Project Scheduling Problem
    Yoosefzadeh, Hamid R.
    Tareghian, Hamed R.
    Farahi, Mohammad H.
    NAVAL RESEARCH LOGISTICS, 2014, 61 (01) : 44 - 55
  • [27] Flexible resource-constrained resource leveling project scheduling problem
    Yu, Xiao-Guang
    Zhan, De-Chen
    Nie, Lan-Shun
    Chu, Dian-Hui
    Xu, Xiao-Fei
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1967 - 1976
  • [28] Network decomposition techniques for resource-constrained project scheduling
    Sprecher, A
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2002, 53 (04) : 405 - 414
  • [29] A Neurogenetic approach for the resource-constrained project scheduling problem
    Agarwal, Anurag
    Colak, Selcuk
    Erenguc, Selcuk
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) : 44 - 50
  • [30] Multimode resource-constrained project scheduling in flexible projects
    Kosztyan, Zsolt T.
    Szalkai, Istvan
    JOURNAL OF GLOBAL OPTIMIZATION, 2020, 76 (01) : 211 - 241