Approximate policy iteration for dynamic resource-constrained project scheduling

被引:6
|
作者
Parizi, Mahshid Salemi [1 ]
Gocgun, Yasin [2 ]
Ghate, Archis [1 ]
机构
[1] Univ Washington, Ind & Syst Engn, BOX 352650, Seattle, WA 98195 USA
[2] Altinbas Univ, Dept Ind Engn, Istanbul, Turkey
关键词
Markov decision processes; Approximate dynamic programming; Queueing;
D O I
10.1016/j.orl.2017.06.002
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We study non-preemptive scheduling problems where heterogeneous projects stochastically arrive over time. The projects include precedence-constrained tasks that require multiple resources. Incomplete projects are held in queues. When a queue is full, an arriving project must be rejected. The goal is to choose which tasks to start in each time-slot to maximize the infinite-horizon discounted expected profit. We provide a weakly coupled Markov decision process (MDP) formulation and apply a simulation-based approximate policy iteration method. Extensive numerical results are presented. (C) 2017 Elsevier B.V. All rights reserved.
引用
收藏
页码:442 / 447
页数:6
相关论文
共 50 条
  • [1] Hybrid Heuristics for Dynamic Resource-Constrained Project Scheduling Problem
    Villela da Silva, Andre Renato
    Ochi, Luiz Satoru
    HYBRID METAHEURISTICS, 2010, 6373 : 73 - 87
  • [2] Insertion techniques for static and dynamic resource-constrained project scheduling
    Artigues, C
    Michelon, P
    Reusser, S
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 149 (02) : 249 - 267
  • [3] A reactive scheduling approach for the resource-constrained project scheduling problem with dynamic resource disruption
    Xu, Jiaojiao
    Bai, Sijun
    KYBERNETES, 2024, 53 (06) : 2007 - 2028
  • [4] Dynamic diversity evolution strategy for resource-constrained project scheduling
    He, Jieguang
    Chen, Xindu
    Chen, Xin
    Liu, Qiang
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2015, 21 (08): : 2089 - 2098
  • [5] Resource-constrained project scheduling and timetabling
    Brucker, P
    Knust, S
    PRACTICE AND THEORY OF AUTOMATED TIMETABLING III, 2001, 2079 : 277 - 293
  • [6] Approximate solution of a resource-constrained scheduling problem
    Renaud Sirdey
    Jacques Carlier
    Dritan Nace
    Journal of Heuristics, 2009, 15 : 1 - 17
  • [7] Approximate solution of a resource-constrained scheduling problem
    Sirdey, Renaud
    Carlier, Jacques
    Nace, Dritan
    JOURNAL OF HEURISTICS, 2009, 15 (01) : 1 - 17
  • [8] Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming
    Li, Haitao
    Womer, Norman K.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 246 (01) : 20 - 33
  • [9] AN ITERATIVE SCHEDULING TECHNIQUE FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING
    LI, KY
    WILLIS, RJ
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 56 (03) : 370 - 379
  • [10] Resource-constrained project scheduling - Minimization of project duration
    不详
    PROJECT SCHEDULING WITH TIME WINDOWS AND SCARCE RESOURCES, 2002, 508 : 21 - 174