An interval-based possibilistic programming method for waste management with cost minimization and environmental-impact abatement under uncertainty

被引:32
|
作者
Li, Y. P. [1 ]
Huang, G. H. [1 ]
机构
[1] N China Elect Power Univ, Res Acad Energy & Environm Studies, Beijing 102206, Peoples R China
关键词
Decision; Environmental impact; Fuzzy programming; Interval analysis; Optimization; Pollution control; Solid waste; Uncertainty; MODEL DEVELOPMENT; SYSTEMS; EMISSIONS; DESIGN;
D O I
10.1016/j.scitotenv.2010.05.038
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Considerable public concerns have been raised in the past decades since a large amount of pollutant emissions from municipal solid waste (MSW) disposal of processes pose risks on surrounding environment and human health. Moreover, in MSW management, various uncertainties exist in the related costs, impact factors and objectives, which can affect the optimization processes and the decision schemes generated. In this study, an interval-based possibilistic programming (IBPP) method is developed for planning the MSW management with minimized system cost and environmental impact under uncertainty. The developed method can deal with uncertainties expressed as interval values and fuzzy sets in the left- and right-hand sides of constraints and objective function. An interactive algorithm is provided for solving the IBPP problem, which does not lead to more complicated intermediate submodels and has a relatively low computational requirement. The developed model is applied to a case study of planning a MSW management system, where mixed integer linear programming (MILP) technique is introduced into the IBPP framework to facilitate dynamic analysis for decisions of timing, sizing and siting in terms of capacity expansion for waste-management facilities. Three cases based on different waste-management policies are examined. The results obtained indicate that inclusion of environmental impacts in the optimization model can change the traditional waste-allocation pattern merely based on the economic-oriented planning approach. The results obtained can help identify desired alternatives for managing MSW, which has advantages in providing compromised schemes under an integrated consideration of economic efficiency and environmental impact under uncertainty. (c) 2010 Elsevier B.V. All rights reserved.
引用
收藏
页码:4296 / 4308
页数:13
相关论文
共 50 条
  • [31] A simulation-based fuzzy possibilistic programming model for coal blending management with consideration of human health risk under uncertainty
    Dai, C.
    Cai, X. H.
    Cai, Y. P.
    Huang, G. H.
    [J]. APPLIED ENERGY, 2014, 133 : 1 - 13
  • [32] A copula-based interval-bistochastic programming method for regional water allocation under uncertainty
    Chen, Shu
    Xu, Jijun
    Li, Qingqing
    Tan, Xuezhi
    Nong, Xizhi
    [J]. AGRICULTURAL WATER MANAGEMENT, 2019, 217 : 154 - 164
  • [33] An interval-parameter mean-CVaR two-stage stochastic programming approach for waste management under uncertainty
    C. Dai
    X. H. Cai
    Y. P. Cai
    Q. Huo
    Y. Lv
    G. H. Huang
    [J]. Stochastic Environmental Research and Risk Assessment, 2014, 28 : 167 - 187
  • [34] An interval-parameter mean-CVaR two-stage stochastic programming approach for waste management under uncertainty
    Dai, C.
    Cai, X. H.
    Cai, Y. P.
    Huo, Q.
    Lv, Y.
    Huang, G. H.
    [J]. STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2014, 28 (02) : 167 - 187
  • [35] A Risk-Based Interval Two-Stage Programming Model for Agricultural System Management under Uncertainty
    Xu, Ye
    Huang, Guohe
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2016, 2016
  • [36] ITSSIP: Interval-parameter two-stage stochastic semi-infinite programming for environmental management under uncertainty
    Guo, P.
    Huang, G. H.
    He, L.
    Sun, B. W.
    [J]. ENVIRONMENTAL MODELLING & SOFTWARE, 2008, 23 (12) : 1422 - 1437
  • [37] 0-1 Piecewise linearization approach for interval-parameter nonlinear programming: application to environmental management under uncertainty
    Li, Y. P.
    Huang, G. H.
    Yang, Z. F.
    Nie, S. L.
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2009, 36 (06) : 1071 - 1084
  • [38] A Monte-Carlo-based interval De Novo programming method for optimal system design under uncertainty
    Gao, P. P.
    Li, Y. P.
    Sun, J.
    Huang, G. H.
    [J]. ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2018, 72 : 30 - 42
  • [39] I-VFRP: An interval-valued fuzzy robust programming approach for municipal waste-management planning under uncertainty
    Cai, Y. P.
    Huang, G. H.
    Lu, H. W.
    Yang, Z. F.
    Tan, Q.
    [J]. ENGINEERING OPTIMIZATION, 2009, 41 (05) : 399 - 418
  • [40] A Superiority-Inferiority-Based Inexact Fuzzy Stochastic Programming Approach for Solid Waste Management Under Uncertainty
    Qian Tan
    Gordon H. Huang
    Yanpeng Cai
    [J]. Environmental Modeling & Assessment, 2010, 15 : 381 - 396