ITSSIP: Interval-parameter two-stage stochastic semi-infinite programming for environmental management under uncertainty

被引:34
|
作者
Guo, P. [1 ]
Huang, G. H. [1 ]
He, L. [1 ,2 ]
Sun, B. W. [3 ]
机构
[1] Univ Regina, Environm Syst Engn Program, Regina, SK S4S 0A2, Canada
[2] N China Elect Power Univ, Chinese Res Acad Environm Sci, Beijing 10001210220, Peoples R China
[3] Cent Univ Finance & Econ, Beijing 100081, Peoples R China
关键词
chance-constrained; decision making; environment; functional interval; semi-infinite; solid waste; two-stage; uncertainty;
D O I
10.1016/j.envsoft.2008.04.009
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this study, an interval-para meter two-stage stochastic semi-infinite programming (ITSSIP) method is developed for municipal solid waste (MSW) management under uncertainty. In order to better account for uncertainties, the uncertainties are expressed with discrete intervals, functional intervals and probability distributions. The ITSSIP method integrates the two-stage stochastic programming (TSP), interval programming (IP), chance-constrained programming (CCP) and semi-infinite programming (SIP) within a general optimization framework. ITSSIP has infinite constraint because it uses functional intervals with time (s) being an independent variable. At the same time, ITSSIP also presents probability distribution information. The ITSSIP method can incorporate pre-regulated MSW management policies directly into its optimization process to analyze various policy scenarios having different economic penalties when the promised amounts are not delivered. The model is applied to a MSW management system with three waste treatment facilities, three cities and three periods. As an extension of mathematical programming methods, the developed ITSSIP approach has advantages in uncertainty reflection and policy analysis. Firstly, ITSSIP can help generate optimal solutions for decision variables under different levels of waste-generation rate and different levels of constraint-violation probability, which are informative for decision makers: secondly, it has the capability in addressing the parameter's dynamic feature, i.e., variations of the parameters with time; this could hardly be reflected in the previous methods. The obtained solutions are useful for decision makers to obtain insight regarding the tradeoffs between environmental, economic and system-reliability criteria. (C) 2008 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1422 / 1437
页数:16
相关论文
共 50 条
  • [1] Interval-parameter Two-stage Stochastic Semi-infinite Programming: Application to Water Resources Management under Uncertainty
    Guo, P.
    Huang, G. H.
    He, L.
    Zhu, H.
    [J]. WATER RESOURCES MANAGEMENT, 2009, 23 (05) : 1001 - 1023
  • [2] Interval-parameter Two-stage Stochastic Semi-infinite Programming: Application to Water Resources Management under Uncertainty
    P. Guo
    G. H. Huang
    L. He
    H. Zhu
    [J]. Water Resources Management, 2009, 23 : 1001 - 1023
  • [3] Interval-parameter two-stage stochastic nonlinear programming for water resources management under uncertainty
    Li, Yong P.
    Huang, Guo H.
    [J]. WATER RESOURCES MANAGEMENT, 2008, 22 (06) : 681 - 698
  • [4] Interval-parameter Two-stage Stochastic Nonlinear Programming for Water Resources Management under Uncertainty
    Yong P. Li
    Guo H. Huang
    [J]. Water Resources Management, 2008, 22 : 681 - 698
  • [5] An interval-parameter two-stage stochastic integer programming model for environmental systems planning under uncertainty
    Li, Y. P.
    Huang, G. H.
    Nie, S. L.
    Nie, X. H.
    Maqsood, I.
    [J]. ENGINEERING OPTIMIZATION, 2006, 38 (04) : 461 - 483
  • [6] Interval-parameter semi-infinite programming model for used tire management and planning under uncertainty
    Simic, Vladimir
    Dabic-Ostojic, Svetlana
    Bojovic, Nebojsa
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 113 : 487 - 501
  • [7] Interval-parameter Fuzzy-stochastic Semi-infinite Mixed-integer Linear Programming for Waste Management under Uncertainty
    P. Guo
    G. H. Huang
    L. He
    H. L. Li
    [J]. Environmental Modeling & Assessment, 2009, 14
  • [8] Interval-parameter Fuzzy-stochastic Semi-infinite Mixed-integer Linear Programming for Waste Management under Uncertainty
    Guo, P.
    Huang, G. H.
    He, L.
    Li, H. L.
    [J]. ENVIRONMENTAL MODELING & ASSESSMENT, 2009, 14 (04) : 521 - 537
  • [9] An interval-parameter mean-CVaR two-stage stochastic programming approach for waste management under uncertainty
    Dai, C.
    Cai, X. H.
    Cai, Y. P.
    Huo, Q.
    Lv, Y.
    Huang, G. H.
    [J]. STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2014, 28 (02) : 167 - 187
  • [10] An interval-parameter mean-CVaR two-stage stochastic programming approach for waste management under uncertainty
    C. Dai
    X. H. Cai
    Y. P. Cai
    Q. Huo
    Y. Lv
    G. H. Huang
    [J]. Stochastic Environmental Research and Risk Assessment, 2014, 28 : 167 - 187