RISK MANAGEMENT IN PROJECTS: PECULIARITIES OF LITHUANIAN CONSTRUCTION COMPANIES

被引:32
|
作者
Banaitiene, Nerija [1 ]
Banaitis, Audrius [1 ]
Norkus, Arturas [2 ]
机构
[1] Vilnius Gediminas Tech Univ, Dept Construct Econ & Property Management, LT-10223 Vilnius, Lithuania
[2] Panevezio Statybos Trestas SC, Panevezys, Lithuania
关键词
Risk analysis; Risk management; Construction companies; Project management; FUZZY APPROACH; SCHEDULE RISK; UNCERTAINTY; CONTRACTS; SELECTION; MODEL;
D O I
10.3846/1648715X.2011.568675
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Risk analysis and management is nowadays a critical factor to successful construction project management, as construction projects tend to be more complex, dynamic, always unique, and competition increasingly tougher. Risk management helps the project participants client, contractor or developer, consultant, and supplier - to meet their commitments and minimize negative impacts on construction project scope, cost, schedule (and quality, as a result). The benefits of the risk management process include identifying and analyzing risks, and improvement of construction project management processes and effective use of resources. This paper reports the research that aims to discover how construction companies perceive the significance of the construction projects risks they face and the extent to which they employ potential risk responses.
引用
收藏
页码:60 / 73
页数:14
相关论文
共 50 条
  • [21] Importance of Risk Process in Management Software Projects in Small Companies
    Nogueira, Marcelo
    Machado, Ricardo J.
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: INNOVATIVE AND KNOWLEDGE-BASED PRODUCTION MANAGEMENT IN A GLOBAL-LOCAL WORLD, APMS 2014, PT II, 2014, 439 : 358 - 365
  • [22] Integrating project risk management into the management of engineering construction projects
    Jobling, P
    INNOVATION IN CIVIL AND CONSTRUCTION ENGINEERING, 1997, : 183 - 187
  • [23] Impacts of change management on risk and cost management of a construction projects
    Halou, Mohamed Ibrahim Khalifa
    Samin, Razali
    Ahmad, Mushtaq
    JOURNAL OF PROJECT MANAGEMENT, 2019, 4 (02) : 157 - 164
  • [24] Enhancing Risk Management by Partnering in International EPC Projects: Perspective from Evolutionary Game in Chinese Construction Companies
    Yang, Yujing
    Tang, Wenzhe
    Shen, Wenxin
    Wang, Tengfei
    SUSTAINABILITY, 2019, 11 (19)
  • [25] Improving Quantitative Assessment of Political Risk in International Construction Projects: The Case of Chinese Construction Companies
    Chang, Tengyuan
    Deng, Xiaopeng
    Hwang, Bon-Gang
    Zhao, Xiaojing
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (12)
  • [26] Risk management in construction projects using fuzzy logic
    Caballero, Amaury A.
    Yen, Kang K.
    Roig, Gustavo
    Proceedings of the Fourth International Conference on Information and Management Sciences, 2005, 4 : 3 - 9
  • [27] Risk Management in the Construction Phase of Building Projects in Taiwan
    Tsai, Tsung-Chieh
    Yang, Min-Lan
    JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2009, 8 (01) : 143 - 150
  • [28] RELIABILITY, RISK MANAGEMENT, AND CONTINGENCY OF CONSTRUCTION PROCESSES AND PROJECTS
    Turskis, Zenonas
    Gajzler, Marcin
    Dziadosz, Agnieszka
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2012, 18 (02) : 290 - 298
  • [29] A Hybrid MCDM Technique for Risk Management in Construction Projects
    Chatterjee, Kajal
    Zavadskas, Edmundas Kazimieras
    Tamosaitiene, Jolanta
    Adhikary, Krishnendu
    Kar, Samarjit
    SYMMETRY-BASEL, 2018, 10 (02):
  • [30] A Scientometric Analysis of Studies on Risk Management in Construction Projects
    Osei-Kyei, Robert
    Narbaev, Timur
    Ampratwum, Godslove
    BUILDINGS, 2022, 12 (09)