A Hybrid CLP/MP Approach to Modeling and Solving Resource-Constrained Scheduling Problems with Logic Constraints

被引:0
|
作者
Sitek, Pawel [1 ]
Wikarek, Jaroslaw [1 ]
Stefanski, Tadeusz [1 ]
机构
[1] Kielce Univ Technol, Dept Informat Syst, Kielce, Poland
关键词
Constraint programming; Mathematical programming; Resource-constrained scheduling problem; Knowledge-based approach;
D O I
10.1007/978-3-319-54042-9_12
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Constrained scheduling problems are common in everyday life and especially in: distribution, manufacturing, project management, logistics, supply chain management, software engineering, computer networks etc. A large number of integer and binary decision variables representing the allocation of different constrained resources to activities/jobs and constraints on these decision variables are typical elements of the resource-constrained scheduling problems (RCSPs) modeling. Therefore, the models of RCSPs are more demanding, particularly when methods of operations research (OR) are used. By contrast, most resource-constrained scheduling problems can be easily modeled as instances of the constraint satisfaction problems (CSPs) and solved using constraint logic programming (CLP) or others methods. Moreover, CLP-based environments enable easy modeling of various types of constraints including logic constraints. In the CLP-based environment the problem definition is separated from the algorithms and methods used to solve the problem. Therefore, a hybrid approach to resource-constrained scheduling problems that combines an OR-based approach for problem solving and a CLP-based approach for problem modeling is proposed. To evaluate the efficiency and flexibility of this approach, illustrative examples of resource-constrained scheduling problems with logic constraints are implemented using hybrid CLP/MP approach.
引用
收藏
页码:132 / 143
页数:12
相关论文
共 50 条
  • [1] A Constraint-Based Approach to Modeling and Solving Resource-Constrained Scheduling Problems
    Sitek, Pawel
    Wikarek, Jaroslaw
    [J]. COMPUTATIONAL COLLECTIVE INTELLIGENCE, ICCCI 2016, PT I, 2016, 9875 : 423 - 433
  • [2] A Hybrid Approach to Decision Support for Resource-Constrained Scheduling Problems
    Sitek, Pawel
    Nielsen, Izabela
    Wikarek, Jaroslaw
    Nielsen, Peter
    [J]. INTELLIGENT DECISION TECHNOLOGIES 2016, PT I, 2016, 56 : 101 - 113
  • [3] Hybrid Approach of Constraint Programming and Integer Programming for Solving Resource-constrained Project-scheduling Problems
    Cheng Zhao
    Murata, Tomohiro
    [J]. INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTIST, IMECS 2012, VOL II, 2012, : 1574 - 1577
  • [4] A Hybrid Programming Framework for Resource-Constrained Scheduling Problems
    Sitek, Pawel
    Wikarek, Jaroslaw
    [J]. INTELLIGENT DATA ENGINEERING AND AUTOMATED LEARNING - IDEAL 2015, 2015, 9375 : 300 - 308
  • [5] Flexible Scheduling Approach for Resource-Constrained Project Scheduling Problems
    Liu, Shixin
    Tukel, Oya I.
    Rom, W.
    [J]. 2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 3522 - +
  • [6] Solving resource-constrained construction scheduling problems with overlaps by metaheuristic
    Bozejko, Wojciech
    Hejducki, Zdzislaw
    Uchronski, Mariusz
    Wodecki, Mieczyslaw
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2014, 20 (05) : 649 - 659
  • [7] A Lazy-Constraints Approach to Resource-Constrained Project Scheduling
    Lerch, D.
    Trautmann, N.
    [J]. 2019 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2019, : 144 - 148
  • [8] Solving resource-constrained project scheduling problems using Tabu Search
    Ikonomou, A
    Galletly, JE
    Daniel, RC
    [J]. INTELLIGENT SYSTEMS FOR MANUFACTURING: MULTI-AGENT SYSTEMS AND VIRTUAL ORGANIZATION, 1998, : 311 - 322
  • [9] SOLVING RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEMS BY A-STAR SEARCH
    BELL, CE
    PARK, K
    [J]. NAVAL RESEARCH LOGISTICS, 1990, 37 (01) : 61 - 84
  • [10] A heuristic search algorithm for solving resource-constrained project scheduling problems
    Ahsan, MK
    Tsao, DB
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2003, 20 (02) : 143 - 160