Heuristics for the exam scheduling problem

被引:1
|
作者
Fu, ZH [1 ]
Lim, A [1 ]
机构
[1] Natl Univ Singapore, Dept Comp Sci, Singapore 117543, Singapore
关键词
D O I
10.1109/TAI.2000.889864
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
As part of the process of creating a campus-wide timetabling system for the National University of Singapore, the authors investigated examination scheduling algorithms. The challenge in exam scheduling is to draw up the final examination timetable, taking into account a number of different constraints. The authors propose a different approach when the inter-examination gaps (termed paper spread) of each student should be maximized. The results compare favorably against the actual timetable produced by the current manual system.
引用
收藏
页码:172 / 175
页数:4
相关论文
共 50 条
  • [1] Heuristics for a general scheduling problem
    Gutierrez, C
    CEC2004: PROCEEDINGS OF THE 2004 CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1 AND 2, 2004, : 660 - 665
  • [2] On a heuristic for the final exam scheduling problem
    Weitz, RR
    Lakshminarayanan, S
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1996, 47 (04) : 599 - 600
  • [3] Solving the Exam Scheduling Problem with GRA+
    Zhu, Haibin
    Yu, Zhe
    Gningue, Youssou
    2020 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2020, : 1485 - 1490
  • [4] Heuristics for the economic lot scheduling problem with returns
    Teunter, Ruud
    Tang, Ou
    Kaparis, Konstantinos
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 118 (01) : 323 - 330
  • [5] Bin Packing Heuristics for the MultipleWorkflow Scheduling Problem
    Pappas, Nikos
    Oikonomou, Panagiotis
    Tziritas, Nikos
    Kolomvatsos, Kostas
    Loukopoulos, Thanasis
    25TH PAN-HELLENIC CONFERENCE ON INFORMATICS WITH INTERNATIONAL PARTICIPATION (PCI2021), 2021, : 283 - 288
  • [6] A COMPARISON OF HEURISTICS FOR A SCHOOL BUS SCHEDULING PROBLEM
    GRAHAM, D
    NUTTLE, HLW
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 1986, 20 (02) : 175 - 182
  • [7] Heuristics for a coupled-operation scheduling problem
    Potts, C. N.
    Whitehead, J. D.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2007, 58 (10) : 1375 - 1388
  • [8] Learning Heuristics for the Superblock Instruction Scheduling Problem
    Russell, Tyrel
    Malik, Abid M.
    Chase, Michael
    van Beek, Peter
    IEEE TRANSACTIONS ON KNOWLEDGE AND DATA ENGINEERING, 2009, 21 (10) : 1489 - 1502
  • [9] Fast parallel heuristics for the job shop scheduling problem
    Steinhöfel, K
    Albrecht, A
    Wong, CK
    COMPUTERS & OPERATIONS RESEARCH, 2002, 29 (02) : 151 - 169
  • [10] A Robust Heuristics for the Online Job Shop Scheduling Problem
    Zupan, Hugo
    Herakovic, Niko
    Zerovnik, Janez
    ALGORITHMS, 2024, 17 (12)