A mathematical model and two-stage heuristic for hot rolling scheduling in compact strip production

被引:22
|
作者
Pan, Quan-Ke [1 ]
Chen, Qing-da [2 ]
Meng, Tao [3 ]
Wang, Bing [3 ]
Gao, Liang [1 ]
机构
[1] Huazhong Univ Sci & Technol, State Key Lab Digital Mfg Equipment & Technol, Wuhan 430074, Peoples R China
[2] Northeastern Univ, State Key Lab Synthet Automat Proc Ind, Shenyang 110819, Peoples R China
[3] Shanghai Univ, Sch Mechatron Engn & Automat, Shanghai 200444, Peoples R China
基金
中国国家自然科学基金;
关键词
Scheduling; Heuristic; Hot rolling; Compact strip production; OPTIMIZATION ALGORITHM; HYBRID FLOWSHOP; SETUP TIMES; MINIMIZATION; EARLINESS; IRON;
D O I
10.1016/j.apm.2017.03.067
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper addresses a new hot rolling scheduling problem from the compact strip production process, which is the mainstream production technology that is used worldwide for sheet strips. The problem is modeled as a combination of two coupled sub-problems. One sub-problem is a sheet strip assignment problem that assigns sheet strips to rolling turns with the constraints of safe values of different gauge levels, and the other is a sheet strip sequencing problem that decides the rolling sequence for all of the sheet strips in a rolling turn to form a particular parabolic shape in thickness. To solve this hot rolling scheduling problem, we present a novel approach that consists of a sheet strip assignment heuristic and a sheet strip sequencing heuristic. The sheet strip assignment heuristic minimizes the number of virtual sheet strips by generating rolling turns according to the ordered sheet strips with maximum gauge level and their safe values. The sheet strip sequencing heuristic minimizes the average change of the thickness of adjacent sheet strips by arranging a certain number of duplicate sheet strips to the increasing stage of a rolling turn. Extensive experiments based on both synthetic and real-world instances from a compact strip production process show the effectiveness of the proposed two-stage.heuristic in solving the hot rolling scheduling problem. (C) 2017 Published by Elsevier Inc.
引用
收藏
页码:516 / 533
页数:18
相关论文
共 50 条
  • [1] Effective Hot Rolling Batch Scheduling Algorithms in Compact Strip Production
    Chen, Qingda
    Pan, Quanke
    Zhang, Biao
    Ding, Jingliang
    Li, Junqing
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2019, 16 (04) : 1933 - 1951
  • [2] A Two-stage Heuristic Method for Vulcanization Production Scheduling
    Yu, Shengping
    Yang, Diancai
    Wang, Xiuying
    Zhu, Kehui
    Zheng, Binglin
    [J]. 2011 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, 2011, : 3601 - 3605
  • [3] HEURISTIC MODEL FOR PRODUCTION SCHEDULING WIDE-STRIP ROLLING MILL
    Malindzak, D.
    Mihalikova, E.
    Pandula, B.
    [J]. METALURGIJA, 2019, 58 (1-2): : 117 - 119
  • [4] A two-stage scheduling method for hot rolling and its application
    Zhao, Jun
    Wang, Wei
    Liu, Quanli
    Wang, Zhigang
    Shi, Peng
    [J]. CONTROL ENGINEERING PRACTICE, 2009, 17 (06) : 629 - 641
  • [5] A multi-objective hot-rolling scheduling problem in the compact strip production
    Pan, Quan-Ke
    Gao, Liang
    Wang, Ling
    [J]. APPLIED MATHEMATICAL MODELLING, 2019, 73 : 327 - 348
  • [6] Application of mathematical modeling in two-stage rolling of hot rolled wire rods
    Fu, Yu
    Yu, Hao
    [J]. JOURNAL OF MATERIALS PROCESSING TECHNOLOGY, 2014, 214 (09) : 1962 - 1970
  • [7] A Two-Stage Mathematical Model for Cross-Docking Distribution Planning Solved by a Two-Stage Heuristic Algorithm
    Mousavi, S. M.
    Siadat, A.
    Tavakkoli-Moghaddam, R.
    Vahdani, B.
    [J]. 2013 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM 2013), 2013, : 1358 - 1362
  • [8] A Biobjective Optimization for Integrated Parallel Machine Scheduling and Location Problem: Mathematical Model and Iterative Two-Stage Heuristic
    Wu, Peng
    Wang, Yun
    Cheng, Junheng
    Li, Yantong
    [J]. IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2023, 53 (11): : 6897 - 6908
  • [9] A hybrid variable neighborhood search algorithm for the hot rolling batch scheduling problem in compact strip production
    Zhang, Biao
    Pan, Quan-ke
    Gao, Liang
    Zhang, Xin-li
    Chen, Qing-da
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 116 : 22 - 36
  • [10] A new two-stage heuristic for the recreational vehicle scheduling problem
    Kulkarni, Sarang
    Patil, Rahul
    Krishnamoorthy, Mohan
    Ernst, Andreas
    Ranade, Abhiram
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2018, 91 : 59 - 78