共 50 条
- [2] Hybrid algorithm for hot strip mill rolling scheduling problem [J]. Hsi-An Chiao Tung Ta Hsueh/Journal of Xi'an Jiaotong University, 2002, 36 (12): : 1291 - 1294
- [3] Hybrid Variable Neighborhood Search for Batch Scheduling of Hot Rolled Steel Tube [J]. PROCEEDINGS OF 2016 IEEE ADVANCED INFORMATION MANAGEMENT, COMMUNICATES, ELECTRONIC AND AUTOMATION CONTROL CONFERENCE (IMCEC 2016), 2016, : 335 - 338
- [4] A variable neighborhood search algorithm for scheduling the hot rolling operations at a steel mill [J]. 2009 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2009, : 1239 - 1243
- [6] Guided local search algorithm for hot strip mill scheduling problem with considering hot charge rolling [J]. The International Journal of Advanced Manufacturing Technology, 2009, 45
- [7] Guided local search algorithm for hot strip mill scheduling problem with considering hot charge rolling [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 45 (11-12): : 1215 - 1231
- [9] Differential Evolution Algorithm with Variable Neighborhood Search for Hybrid Flow Shop Scheduling Problem [J]. 2016 IEEE 20th International Conference on Computer Supported Cooperative Work in Design (CSCWD), 2016, : 233 - 238