A two-stage scheduling method for hot rolling and its application

被引:32
|
作者
Zhao, Jun [1 ]
Wang, Wei [1 ]
Liu, Quanli [1 ]
Wang, Zhigang [1 ]
Shi, Peng [2 ]
机构
[1] Dalian Univ Technol, Res Ctr Informat & Control, Dalian 116024, Peoples R China
[2] Univ Glamorgan, Dept Comp & Math Sci, Pontypridd CF37 1DL, M Glam, Wales
基金
中国国家自然科学基金;
关键词
Hot rolling production scheduling; Vehicle routing problem with time windows; Heuristics; Intelligent search algorithms; TRAVELING SALESMAN PROBLEM; VEHICLE-ROUTING PROBLEM; STEEL PRODUCTION; TIME WINDOWS; ALGORITHM;
D O I
10.1016/j.conengprac.2008.10.014
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Hot rolling scheduling is a difficult problem in the steel processing industry. It involves many objectives and constraints in both technical and practical respects. A two-stage scheduling method is proposed in this paper. Batch planning of staple material is formulated as a VRPTW, which is solved with a modified PGA. Then, batches of the established units are optimized by adjusting rolling sequences using intelligent search algorithms to reach higher hot charge ratios. This method has been applied to a hot strip mill belonging to Baosteel in China. Our results demonstrate that the proposed technique can improve production efficiency and offer significant economic benefits. (C) 2008 Elsevier Ltd. All rights reserved.
引用
收藏
页码:629 / 641
页数:13
相关论文
共 50 条
  • [1] A mathematical model and two-stage heuristic for hot rolling scheduling in compact strip production
    Pan, Quan-Ke
    Chen, Qing-da
    Meng, Tao
    Wang, Bing
    Gao, Liang
    [J]. APPLIED MATHEMATICAL MODELLING, 2017, 48 : 516 - 533
  • [2] Application of mathematical modeling in two-stage rolling of hot rolled wire rods
    Fu, Yu
    Yu, Hao
    [J]. JOURNAL OF MATERIALS PROCESSING TECHNOLOGY, 2014, 214 (09) : 1962 - 1970
  • [3] A two-stage feature selection method with its application
    Zhao, Xuehua
    Li, Daoliang
    Yang, Bo
    Chen, Huiling
    Yang, Xinbin
    Yu, Chenglong
    Liu, Shuangyin
    [J]. COMPUTERS & ELECTRICAL ENGINEERING, 2015, 47 : 114 - 125
  • [4] Two-stage Optimized Scheduling Method and Application for Steelmaking and Continuous Casting
    Wang, Xiuying
    Chai, Tianyou
    Zheng, Binglin
    Wang, Hong
    [J]. 2010 AMERICAN CONTROL CONFERENCE, 2010, : 6109 - 6114
  • [5] A Two-stage Heuristic Method for Vulcanization Production Scheduling
    Yu, Shengping
    Yang, Diancai
    Wang, Xiuying
    Zhu, Kehui
    Zheng, Binglin
    [J]. 2011 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, 2011, : 3601 - 3605
  • [6] Dynamic Robust Optimization Method Based on Two-Stage Evaluation and Its Application in Optimal Scheduling of Integrated Energy System
    Zhou, Bo
    Li, Erchao
    [J]. APPLIED SCIENCES-BASEL, 2024, 14 (12):
  • [7] Hydrodynamics Method and Its Application in Hot Strip Rolling
    Li, Si
    Wang, Zhigang
    Ruan, Jinhua
    Liu, Changming
    Xu, Zengbing
    [J]. STEEL RESEARCH INTERNATIONAL, 2017, 88 (04)
  • [8] Two-Stage Variable-Time-Scale Rolling Scheduling Model with Energy Storage
    Qiao, Wei-Zhuo
    Bao, Yu-Qing
    [J]. 2021 IEEE IAS INDUSTRIAL AND COMMERCIAL POWER SYSTEM ASIA (IEEE I&CPS ASIA 2021), 2021, : 817 - 822
  • [9] Two-stage variable-time-scale rolling scheduling model with energy storage
    Qiao, Wei-Zhuo
    Bao, Yu-Qing
    Ji, Zhen-Ya
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2022, 141
  • [10] Two-Stage Dual Dynamic Programming With Application to Nonlinear Hydro Scheduling
    Flamm, Benjamin
    Eichler, Annika
    Warrington, Joseph
    Lygeros, John
    [J]. IEEE TRANSACTIONS ON CONTROL SYSTEMS TECHNOLOGY, 2021, 29 (01) : 96 - 107