Thermal fatigue tests with actively cooled divertor mock-ups for ITER

被引:9
|
作者
Rodig, M
Duwe, R
Ibbott, C
Jacobson, D
Le Marois, G
Lind, A
Linke, J
Lorenzetto, P
Peacock, A
Plochl, L
Schuster, A
Severi, Y
Vieider, G
Visca, E
Wiechers, B
机构
[1] Forschungszentrum Julich, EURATOM Assoc, D-52425 Julich, Germany
[2] ITER Joint Cent Team, D-85748 Garching, Germany
[3] GMMT Ltd, Borehamwood WD61 RX, England
[4] CEA Grenoble, F-38054 Grenoble, France
[5] Studsvik Mat, S-61182 Nykoping, Sweden
[6] Net Team, D-85748 Garching, Germany
[7] Jet Joint Undertaking, Abingdon OX14 3EA, Oxon, England
[8] Met Werk Plansee GmbH, A-6600 Reutte, Austria
[9] CEN Cadarache, F-13108 St Paul Les Durance, France
[10] ENEA, I-00044 Frascati, Italy
关键词
D O I
10.1016/S0920-3796(98)00131-8
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
Mock-ups for high heat flux components with beryllium and CFC armour materials have been tested by means of the electron beam facility JUDITH. The experiments concerned screening tests to evaluate heat removal efficiency and thermal fatigue tests. CFC monoblocks attached to DS-Cu (Glidcop A125) and CuCrZr tubes by active metal casting and Ti brazing showed the best thermal fatigue behaviour. They survived more than 1000 cycles at heat loads up to 25 MW m(-2) without any indication of failure. Operational limits are given only by the surface temperature on the CFC tiles. Most of the beryllium mock-ups were of the flat tile: type. Joining techniques were brazing, hot isostatic pressing (HIP) and diffusion bonding. HIPed and diffusion bonded Be/Cu modules have not yet reached the standards for application in high heat flux components. The limit of this production method is reached for heat loads of approximately 5 MW m(-2). Brazing with and without silver seems to be a more robust solution. A flat tile mock-up with CuMnSnCe braze was loaded at 5.4 MW m(-2) for 1000 cycles without damage. The first test with a beryllium monoblock joined to a CuCrZr tube by means of Incusil brazing shows promising results; it survived 1000 cycles at 4.5 MW m(-2) without failure. (C) 1998 Elsevier Science S.A. All rights reserved.
引用
收藏
页码:551 / 557
页数:7
相关论文
共 50 条
  • [21] Helium-cooled divertor for DEMO: Manufacture and high heat flux tests of tungsten-based mock-ups
    Norajitra, P.
    Gervash, A.
    Giniyatulin, R.
    Hirai, T.
    Janeschitz, G.
    Krauss, W.
    Kuznetsov, V.
    Makhankov, A.
    Mazul, I.
    Ovchinnikov, I.
    Reiser, J.
    Widak, V.
    [J]. JOURNAL OF NUCLEAR MATERIALS, 2009, 386-88 : 813 - 816
  • [22] Design for in-pile thermal fatigue of first wall mock-ups under ITER relevant conditions
    Schmalz, F.
    Blom, F. J.
    Kamer, S.
    Ketema, D. J.
    [J]. FUSION ENGINEERING AND DESIGN, 2007, 82 (15-24) : 1820 - 1824
  • [23] Design and optimization of W/Cu divertor mock-ups
    Qiang Li and Weiping Shen Lab of Special Ceramics and P/M
    [J]. International Journal of Minerals,Metallurgy and Materials, 2007, (02) : 157 - 159
  • [24] Design and optimization of W/Cu divertor mock-ups
    Li, Qiang
    Shen, Weiping
    [J]. JOURNAL OF UNIVERSITY OF SCIENCE AND TECHNOLOGY BEIJING, 2007, 14 (02): : 157 - 159
  • [25] High heat load properties of actively cooled tungsten/copper mock-ups by explosive joining
    Li, H.
    Chen, J. L.
    Li, J. G.
    Li, Z. X.
    [J]. JOURNAL OF NUCLEAR MATERIALS, 2007, 363 (1-3) : 1226 - 1230
  • [26] Thermal-mechanical test on ITER primary first wall mock-ups
    Dell'Orco, G
    Lorenzetto, P
    Malavasi, A
    Polazzi, G
    Simoncini, M
    Venturi, G
    Zito, D
    [J]. FUSION ENGINEERING AND DESIGN, 2002, 61-62 : 117 - 122
  • [27] Engineering and manufacturing of ITER first mirror mock-ups
    Joanny, M.
    Travere, J. M.
    Salasca, S.
    Corre, Y.
    Marot, L.
    Thellier, C.
    Gallay, G.
    Cammarata, C.
    Passier, B.
    Ferme, J. J.
    [J]. REVIEW OF SCIENTIFIC INSTRUMENTS, 2010, 81 (10):
  • [28] Method design, manufacture and tests of the porous beryllium mock-ups for the ITER breeding blanket
    Davydov, D.A.
    Solonin, M.I.
    Markuchkin, Yu.E.
    Gorokhov, V.A.
    Gorlevsky, V.V.
    [J]. Journal of Nuclear Materials, 1999, 271-272 : 435 - 439
  • [29] Mechanical Tests on Reduced Scale Mock-Ups of ITER Pre-compression Rings
    Rossi, Paolo
    Ilyin, Yuri
    Mitchell, Neil
    Boter, Eva
    Hernandez, Angela
    Bonito-Oliva, Alessandro
    Mugnaini, Giampiero
    Saidoun, Abdelkrim
    [J]. IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2024, 34 (05) : 1 - 4
  • [30] The method design, manufacture and tests of the porous beryllium mock-ups for the ITER breeding blanket
    Davydov, DA
    Solonin, MI
    Markuchkin, YE
    Gorokhov, VA
    Gorlevsky, VV
    [J]. JOURNAL OF NUCLEAR MATERIALS, 1999, 271 : 435 - 439