Financial Risk Identification and Management of Road Projects in Hybrid Annuity Model

被引:0
|
作者
Gilbile, Pratiksha B. [1 ]
Vyas, Gayatri S. [2 ]
机构
[1] Coll Engn, Pune, Maharashtra, India
[2] Coll Engn, Dept Civil Engn, Pune, Maharashtra, India
关键词
PPP; Hybrid Annuity Model; Net Present Value-@-Risk; Financial feasibility;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Public-private partnership (PPP) models are in demand for infrastructure development all over the world. Due to financial limitations and growing infrastructure sector has lead to the development of various PPP models in developing countries. Indian highway sector is facing many financial challenges in implementing existing PPP models. There are different PPP models in the highway sector such as build-operate-transfer, design-build-operate-transfer, and build-own-operate-transfer. A new variant of the PPP-hybrid annuity model (HAM) is introduced by the National Highway Authority of India in 2016. The research work aims to develop a financial risk model for HAM from the government's perspective in road infrastructure projects. In this study, NPV (net present value)-@-Risk Model is developed. NPV-@-Risk is the NPV at a specific confidence level. It is the decision-making tool in determining the financial feasibility of the project. From the literature, financial risk parameters are identified and a case study of the road project is selected. Project cash flows are drawn for the project. The probability distribution is applied for risk parameters. Model is developed in @Risk software and Monte Carlo simulation is done to analyze the results. This considers uncertainties involved in project cash flow. The result shows the variation of NPV and the most influencing parameter on project cash flow. This research work provides investment decision and risk evaluation of the project for both government as well as a concessionaire. The limitation of the study is, it is applied to one case study due to limitations in the availability of project financial data.
引用
收藏
页码:101 / 109
页数:9
相关论文
共 50 条
  • [31] Risk Management Model for Electricity Market Based on Hybrid Auctions of Financial Transmission and Storage Rights
    Han D.
    He Y.
    He H.
    Ren H.
    Gong K.
    Dianwang Jishu/Power System Technology, 2021, 45 (08): : 3219 - 3227
  • [32] IDENTIFICATION OF CAUSES OF RISK IN THE MANAGEMENT OF LARGE CONSTRUCTION PROJECTS IN SPAIN
    Rebollar-Rubio, Ruben
    Lidon-Lopez, Ivan
    Perez-Cebrian, Alfonso
    DYNA, 2012, 87 (06): : 689 - 697
  • [33] EUROPEAN FINANCIAL SUPPORT AND SUCCESFUL ROAD PPP PROJECTS
    Garrido, Laura
    de los Angeles Baeza, Maria
    Manuel Vassallo, Jose
    XII CONGRESO DE INGENIERIA DEL TRANSPORTE, 2016, : 306 - 317
  • [34] Variable annuity pricing, valuation, and risk management: a survey
    Feng, Runhuan
    Gan, Guojun
    Zhang, Ning
    SCANDINAVIAN ACTUARIAL JOURNAL, 2022, : 867 - 900
  • [35] A MONTE CARLO SIMULATION METHOD FOR RISK MANAGEMENT IN ROAD PAVEMENT MAINTENANCE PROJECTS
    Arba, Raluca
    Jecan, Sergiu
    Rusu, Lucia
    Sitar-Taut, Dan-Andrei
    ENVIRONMENTAL ENGINEERING AND MANAGEMENT JOURNAL, 2019, 18 (08): : 1639 - 1646
  • [36] Study on the Model of Integrated Risk Management for BOT Projects
    Jiang, Gongliang
    ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 3374 - 3377
  • [37] Quality risk management model for railway construction projects
    Li Qing
    Liu Rengkui
    Zhang Jun
    Sun Quanxin
    2014 INTERNATIONAL SYMPOSIUM ON SAFETY SCIENCE AND TECHNOLOGY, 2015, 84 : 195 - 203
  • [38] Price risk management in BOT railroad construction projects using financial derivatives
    Vahdatmanesh, Mohammad
    Firouzi, Afshin
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2018, 23 (03) : 349 - 362
  • [39] A financial risk identification model based on artificial intelligence
    Wang, Bai
    WIRELESS NETWORKS, 2024, 30 (05) : 4157 - 4165
  • [40] The Study on Financial Risk Identification based on Matrix Model
    Xu, Haoyang
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON LOGISTICS, ENGINEERING, MANAGEMENT AND COMPUTER SCIENCE, 2014, 101 : 592 - 595