An Interval-parameter Multi-stage Stochastic Chance-constrained Mixed Integer Programming Model for Inter-basin Water Resources Management Systems under Uncertainty

被引:6
|
作者
Han, Y. C. [1 ]
Huang, G. H. [2 ]
Li, C. H. [1 ]
机构
[1] Beijing Normal Univ, Sch Environm, State Key Lab Water Environm Simulat, Beijing 100875, Peoples R China
[2] Univ Regina, Fac Engn, Regina, SK S4S 0A2, Canada
关键词
Decision making; Environment; Inexact optimization; Multistage; Uncertainty; Water resources;
D O I
10.1109/FSKD.2008.465
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In this study, an interval-parameter multi-stage stochastic chance-constrained mixed integer programming (IMSCMIP) method has been developed for inter-basin water resources management systems under uncertainty. By incorporating the chance-constrained programming (CCP) techniques, and mixed integer programming within an interval-parameter multi-stage stochastic programming framework, the model improves upon the interval-parameter multi-stage stochastic programming (IMSP) and can deal with uncertainties expressed as not only possibility and probabilities distributions but also as discrete intervals, and can incorporate pre-defined water policies directly into its optimization process. A multilayer scenario tree is used to tackle the uncertainties expressed as probability distributions and discrete intervals in IMSCMIP.
引用
收藏
页码:146 / +
页数:3
相关论文
共 50 条
  • [31] Stochastic transitions of a mixed-integer linear programming model for the construction supply chain: chance-constrained programming and two-stage programming
    Koutsokosta, Aspasia
    Katsavounis, Stefanos
    [J]. OPERATIONAL RESEARCH, 2024, 24 (03)
  • [32] Inexact nonlinear improved fuzzy chance-constrained programming model for irrigation water management under uncertainty
    Zhang, Chenglong
    Zhang, Fan
    Guo, Shanshan
    Liu, Xiao
    Guo, Ping
    [J]. JOURNAL OF HYDROLOGY, 2018, 556 : 397 - 408
  • [33] An interval-parameter mean-CVaR two-stage stochastic programming approach for waste management under uncertainty
    Dai, C.
    Cai, X. H.
    Cai, Y. P.
    Huo, Q.
    Lv, Y.
    Huang, G. H.
    [J]. STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2014, 28 (02) : 167 - 187
  • [34] An Uncertainty-Based Random Boundary Interval Multi-Stage Stochastic Programming for Water Resources Planning
    Mehri Raei
    Javad Hossienzad
    Mohammad Ali Ghorbani
    [J]. Water Resources Management, 2023, 37 : 4571 - 4587
  • [35] An Uncertainty-Based Random Boundary Interval Multi-Stage Stochastic Programming for Water Resources Planning
    Raei, Mehri
    Hossienzad, Javad
    Ghorbani, Mohammad Ali
    [J]. WATER RESOURCES MANAGEMENT, 2023, 37 (12) : 4571 - 4587
  • [36] Two-stage fuzzy chance-constrained programming: application to water resources management under dual uncertainties
    P. Guo
    G. H. Huang
    [J]. Stochastic Environmental Research and Risk Assessment, 2009, 23 : 349 - 359
  • [37] An interval-parameter mean-CVaR two-stage stochastic programming approach for waste management under uncertainty
    C. Dai
    X. H. Cai
    Y. P. Cai
    Q. Huo
    Y. Lv
    G. H. Huang
    [J]. Stochastic Environmental Research and Risk Assessment, 2014, 28 : 167 - 187
  • [38] Interval-Parameter Linear Optimization Model with Stochastic Vertices for Land and Water Resources Allocation Under Dual Uncertainty
    Han, Yan
    Huang, Yuefei
    Wang, Guangqian
    [J]. ENVIRONMENTAL ENGINEERING SCIENCE, 2011, 28 (03) : 197 - 205
  • [39] ITSSIP: Interval-parameter two-stage stochastic semi-infinite programming for environmental management under uncertainty
    Guo, P.
    Huang, G. H.
    He, L.
    Sun, B. W.
    [J]. ENVIRONMENTAL MODELLING & SOFTWARE, 2008, 23 (12) : 1422 - 1437
  • [40] Two-stage fuzzy chance-constrained programming: application to water resources management under dual uncertainties
    Guo, P.
    Huang, G. H.
    [J]. STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2009, 23 (03) : 349 - 359