Scalable material assignment methods for build-to-order environments

被引:1
|
作者
Chen, Kaipei [1 ]
Moses, Scott A. [1 ]
Pulat, P. Simin [1 ]
机构
[1] Univ Oklahoma, Sch Ind Engn, Norman, OK 73019 USA
基金
美国国家科学基金会;
关键词
material requirements planning; MRP; material planning; material assignment; build-to-order; BTO; resource allocation; scalability;
D O I
10.1504/EJIE.2007.012655
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper develops scalable and effective yet simple heuristic methods for material assignment in a large discrete Build-To-Order (BTO) environment. The material assignment function allocates available supplies of raw material to orders over a period of time. Despite popular belief to the contrary, Material Requirements Planning (MRP) does not perform material assignment. As a result, material supplies are by default consumed by orders on a First Come First Served (FCFS) basis and this allows low priority orders to obtain material instead of high priority orders. We develop heuristic methods that consider priority when performing material assignment and study their effectiveness using total weighted tardiness, total tardiness, fraction of orders that are tardy and computational time as performance measures. The material assignment problem is formulated as a transportation problem to obtain a lower bound for the heuristics in terms of total weighted tardiness. Simulation results show that one of the heuristics yields solutions whose total weighted tardiness is within about 0.25% of the optimal solution, yet is very scalable and able to quickly assign materials in realistically sized systems with many tens of thousands of orders.
引用
收藏
页码:74 / 92
页数:19
相关论文
共 50 条
  • [21] Planning of capacities and orders in build-to-order automobile production: A review
    Volling, Thomas
    Matzke, Andreas
    Grunewald, Martin
    Spengler, Thomas S.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2013, 224 (02) : 240 - 260
  • [22] Build-to-order nanostructures using DNA self-assembly
    Asakawa, Takeshi
    Nishi, Kentaro
    Mizuno, Rika
    Yoneda, Kazuhiro
    Okada, Takao
    Hayashi, Kenshi
    [J]. THIN SOLID FILMS, 2006, 509 (1-2) : 85 - 93
  • [23] Application of Customer Maturity Level to Build-to-order Supply Chain
    Li, Hainan
    [J]. 2011 INTERNATIONAL CONFERENCE ON FUTURE COMPUTER SCIENCE AND APPLICATION (FCSA 2011), VOL 4, 2011, : 96 - 99
  • [24] Information technology and performance management for build-to-order supply chains
    Sharif, Amir M.
    Irani, Zahir
    Lloyd, Don
    [J]. INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2007, 27 (11) : 1235 - 1253
  • [25] Heuristic Scheduling of Job Orders in a Build-to-Order Manufacturing System
    Wang C.-N.
    Chou C.-C.
    Chung Y.-C.
    Phuc Phan N.K.
    Nguyen V.T.
    Nguyen V.T.
    [J]. Computer Systems Science and Engineering, 2021, 40 (03):
  • [26] Supply strategies for build-to-order: managing global auto operations
    Miemczyk, Joe
    Howard, Mickey
    [J]. SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL, 2008, 13 (01) : 3 - 8
  • [27] Optimal return policy and modular design for build-to-order products
    Mukhopadhyay, SK
    Setoputro, R
    [J]. JOURNAL OF OPERATIONS MANAGEMENT, 2005, 23 (05) : 496 - 506
  • [28] Automotive Industry Information Systems: From Mass Production to Build-to-Order
    Howard, Mickey
    Powell, Philip
    Vidgen, Richard
    [J]. JOURNAL OF CASES ON INFORMATION TECHNOLOGY, 2005, 7 (02) : 16 - 30
  • [29] Enabling mass customization: extending build-to-order concepts to supply chains
    Coronado, AE
    Lyons, AC
    Kehoe, DF
    Coleman, J
    [J]. PRODUCTION PLANNING & CONTROL, 2004, 15 (04) : 398 - 411