共 14 条
- [5] Assessment of Uncertainty Effects in Integrated Generation and Transmission Expansion Planning: a Colombian Case Study [J]. 2018 IEEE ANDESCON, 2018,
- [6] Advanced model for joint generation and transmission expansion planning including reactive power and security constraints of the network integrated with wind turbine [J]. INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2019, 29 (04):
- [7] Projecting Urban Expansion by Analyzing Growth Patterns and Sustainable Planning Strategies-A Case Study of Kamrup Metropolitan, Assam, North-East India [J]. EARTH, 2024, 5 (02): : 169 - 194