Min-Conflicts Heuristic for Multi-Mode Resource-Constrained Projects Scheduling

被引:3
|
作者
Ahmeti, Arben [1 ]
Musliu, Nysret [2 ]
机构
[1] TU Wien, DBAI, Inst Log & Computat, Vienna, Austria
[2] TU Wien, DBAI, Christian Doppler Lab Artificial Intelligence & O, Inst Log & Computat, Vienna, Austria
关键词
Project scheduling; Multi-Mode Resource-Constrained Multiple Projects Scheduling Problem; Iterated Local Search; Min Conflicts; LOCAL SEARCH;
D O I
10.1145/3205455.3205620
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
We investigate solving of Multi-Mode Resource-Constrained Multiple Projects Scheduling Problem by heuristic techniques. A new method based on Min-Conflicts heuristic is proposed and evaluated. The main idea is to efficiently explore the neighborhood of current solution based on conflicts of activities that share the same resources. This technique is further used within the Iterated Local Search framework that additionally includes the perturbation and the acceptance criteria. Furthermore, we propose three novel project-wise neighborhood operators. Our method is evaluated on benchmark instances proposed in the MISTA conference challenge and compared to the state-of-the-art approaches. Our algorithm obtains competitive results to the solver ranked third in the MISTA challenge. We also applied our method on the existing benchmark instances for multiple-mode resource constrained single project scheduling problems. We provide six new upper bounds for well-known instances of the MMLIB library.
引用
收藏
页码:237 / 244
页数:8
相关论文
共 50 条
  • [41] Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem
    Vincent Van Peteghem
    Mario Vanhoucke
    [J]. Journal of Heuristics, 2011, 17 : 705 - 728
  • [42] Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem
    Van Peteghem, Vincent
    Vanhoucke, Mario
    [J]. JOURNAL OF HEURISTICS, 2011, 17 (06) : 705 - 728
  • [43] The Multi-Mode Resource-Constrained Multi-Project Scheduling ProblemThe MISTA 2013 challenge
    Tony Wauters
    Joris Kinable
    Pieter Smet
    Wim Vancroonenburg
    Greet Vanden Berghe
    Jannes Verstichel
    [J]. Journal of Scheduling, 2016, 19 : 271 - 283
  • [44] A Decomposition Method for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem (MRCMPSP)
    Kuehn, Mathias
    Dirkmann, Sebastian
    Voelker, Michael
    Schmidt, Thorsten
    [J]. OPERATIONS RESEARCH PROCEEDINGS 2016, 2018, : 521 - 526
  • [45] An effective estimation of distribution algorithm for the multi-mode resource-constrained project scheduling problem
    Wang, Ling
    Fang, Chen
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (02) : 449 - 460
  • [46] Ant colony optimization with parameter adaptation for multi-mode resource-constrained project scheduling
    Chiang, Chuan-Wen
    Huang, Yu-Qing
    Wang, Wen-Yen
    [J]. JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2008, 19 (4-5) : 345 - 358
  • [47] A solution framework for the multi-mode resource-constrained cross-dock scheduling problem
    Hermel, Dror
    Hasheminia, Hamed
    Adler, Nicole
    Fry, Michael J.
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2016, 59 : 157 - 170
  • [48] A Path-Relinking algorithm for the multi-mode resource-constrained project scheduling problem
    Fernandes Muritiba, Albert Einstein
    Rodrigues, Carlos Diego
    da Costa, Franciio Araujo
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2018, 92 : 145 - 154
  • [49] An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem
    Messelis, Tommy
    De Causmaecker, Patrick
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 233 (03) : 511 - 528
  • [50] Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
    Sprecher, A
    Drexl, A
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 107 (02) : 431 - 450