Min-Conflicts Heuristic for Multi-Mode Resource-Constrained Projects Scheduling

被引:3
|
作者
Ahmeti, Arben [1 ]
Musliu, Nysret [2 ]
机构
[1] TU Wien, DBAI, Inst Log & Computat, Vienna, Austria
[2] TU Wien, DBAI, Christian Doppler Lab Artificial Intelligence & O, Inst Log & Computat, Vienna, Austria
关键词
Project scheduling; Multi-Mode Resource-Constrained Multiple Projects Scheduling Problem; Iterated Local Search; Min Conflicts; LOCAL SEARCH;
D O I
10.1145/3205455.3205620
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
We investigate solving of Multi-Mode Resource-Constrained Multiple Projects Scheduling Problem by heuristic techniques. A new method based on Min-Conflicts heuristic is proposed and evaluated. The main idea is to efficiently explore the neighborhood of current solution based on conflicts of activities that share the same resources. This technique is further used within the Iterated Local Search framework that additionally includes the perturbation and the acceptance criteria. Furthermore, we propose three novel project-wise neighborhood operators. Our method is evaluated on benchmark instances proposed in the MISTA conference challenge and compared to the state-of-the-art approaches. Our algorithm obtains competitive results to the solver ranked third in the MISTA challenge. We also applied our method on the existing benchmark instances for multiple-mode resource constrained single project scheduling problems. We provide six new upper bounds for well-known instances of the MMLIB library.
引用
收藏
页码:237 / 244
页数:8
相关论文
共 50 条
  • [1] Resource-constrained project scheduling: a heuristic for the multi-mode case
    Heilmann, R
    [J]. OR SPEKTRUM, 2001, 23 (03): : 335 - 357
  • [2] Scheduling Multi-Mode Resource-Constrained Projects Using Heuristic Rules Under Uncertainty Environment
    Abdel-Basset, Mohamed
    Sleem, Ahmed
    Atef, Asmaa
    Nam, Yunyoung
    Abouhawwash, Mohamed
    [J]. CMC-COMPUTERS MATERIALS & CONTINUA, 2022, 70 (01): : 847 - 874
  • [3] Multi-mode resource-constrained project scheduling using modified variable neighborhood search heuristic
    Chakrabortty, Ripon K.
    Abbasi, Alireza
    Ryan, Michael J.
    [J]. INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2020, 27 (01) : 138 - 167
  • [4] Simulated Annealing for Multi-Mode Resource-Constrained Project Scheduling
    Joanna Józefowska
    Marek Mika
    Rafał Różycki
    Grzegorz Waligóra
    Jan Węglarz
    [J]. Annals of Operations Research, 2001, 102 : 137 - 155
  • [5] Simulated annealing for multi-mode resource-constrained project scheduling
    Józefowska, J
    Mika, M
    Rózycki, R
    Waligóra, G
    Weglarz, J
    [J]. ANNALS OF OPERATIONS RESEARCH, 2001, 102 (1-4) : 137 - 155
  • [6] Modelling and Solving Multi-mode Resource-Constrained Project Scheduling
    Szeredi, Ria
    Schutt, Andreas
    [J]. PRINCIPLES AND PRACTICE OF CONSTRAINT PROGRAMMING, CP 2016, 2016, 9892 : 483 - 492
  • [7] The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem
    Wauters, Tony
    Kinable, Joris
    Smet, Pieter
    Vancroonenburg, Wim
    Vanden Berghe, Greet
    Verstichel, Jannes
    [J]. JOURNAL OF SCHEDULING, 2016, 19 (03) : 271 - 283
  • [8] Hybrid Heuristics for Multi-mode Resource-Constrained Project Scheduling
    Tchao, Celso
    Martins, Simone L.
    [J]. LEARNING AND INTELLIGENT OPTIMIZATION, 2008, 5313 : 234 - +
  • [9] Heuristic scheduling of resource-constrained projects with cash flows
    Padman, R
    SmithDaniels, DE
    SmithDaniels, VL
    [J]. NAVAL RESEARCH LOGISTICS, 1997, 44 (04) : 365 - 381
  • [10] Heuristic scheduling of resource-constrained, multiplemode and repetitive projects
    Zhang, Hong
    Li, Heng
    Tam, C. M.
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2006, 24 (02) : 159 - 169