Carbon footprint forecasting using time series data mining methods: the case of Turkey

被引:11
|
作者
Akyol, Muge [1 ]
Ucar, Emine [2 ]
机构
[1] Iskenderun Tech Univ, Dept Logist Management, Fac Business & Management Sci, Antakya, Turkey
[2] Iskenderun Tech Univ, Fac Business & Management Sci, Dept Management Informat Syst, Antakya, Turkey
关键词
Carbon footprint; Renewable energy; Time series data mining; SMOreg; ARTIFICIAL NEURAL-NETWORK; CO2; EMISSIONS; ENERGY-CONSUMPTION; ECONOMIC-GROWTH; ALGORITHM;
D O I
10.1007/s11356-021-13431-6
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In the globalizing world, many factors such as rapidly increasing population, production and consumption habits, and economic growth cause climate changes. The carbon footprint is a measure of CO2 emissions released into the atmosphere, which increases day by day, causing glaciers to melt and increase sea level, reduce water resources, and global warming. For Turkey, as a country trying to complete its economic development, signed international agreements such as the Paris Climate Agreement and Kyoto Protocol to reduce the carbon footprint give great importance to the studies estimating carbon footprint and making policies to reduce it. For this reason, in this study it is aimed to estimate the greenhouse gas emissions of Turkey in the year 2030 and to determine its damages to the economy. Time series forecasting algorithm in the WEKA data mining software was used for analysis, and population, gross domestic product, energy production, and energy consumption were used as independent variables. As a result of analysis using data from the years 1990-2017, as long as Turkey continues its course of gradually increasing the amount of current greenhouse gas emissions in the year 2030, 728.3016 metric tons of CO2 equivalent will be reached. It appears that these estimates remain below the rate of Turkey's commitments at the Paris Climate Agreement that is considered to be promising for Turkey. However, the estimations in other studies should not be ignored; policy makers should determine policies accordingly.
引用
收藏
页码:38552 / 38562
页数:11
相关论文
共 50 条
  • [31] Flood prediction using Time Series Data Mining
    Damle, Chaitanya
    Yalcin, Ali
    [J]. JOURNAL OF HYDROLOGY, 2007, 333 (2-4) : 305 - 316
  • [32] Forecasting Sunspot Time Series Using Deep Learning Methods
    Zeydin Pala
    Ramazan Atici
    [J]. Solar Physics, 2019, 294
  • [33] Forecasting Sunspot Time Series Using Deep Learning Methods
    Pala, Zeydin
    Atici, Ramazan
    [J]. SOLAR PHYSICS, 2019, 294 (05)
  • [34] Forecasting Pipeline Construction Costs Using Time Series Methods
    Kim, Sooin
    Abediniangerabi, Bahram
    Shahandashti, Mohsen
    [J]. PIPELINES 2020: CONDITION ASSESSMENT, CONSTRUCTION, REHABILITATION, AND TRENCHLESS TECHNOLOGIES, 2020, : 198 - 209
  • [35] Evaluation of classification and forecasting methods on time series gene expression data
    Tripto, Nafis Irtiza
    Kabir, Mohimenul
    Bayzid, Md. Shamsuzzoha
    Rahman, Atif
    [J]. PLOS ONE, 2020, 15 (11):
  • [36] Using methods of time series data mining to recognize the influences of environmental factors on bullous pemphigoid
    Lai, Jian-Liang
    Chang, Yu-Ming
    Chen, Pin-Liang
    Chou, Lih-Ching
    Lee, Ding-Dar
    Yang, Meng-Han
    [J]. JOURNAL OF THE CHINESE INSTITUTE OF ENGINEERS, 2018, 41 (08) : 643 - 650
  • [37] Using methods of time series data mining to recognize the influences of environmental factors on epileptic seizures
    Lin, Jhe-Nan
    Yang, Fu-Yi
    Sun, Wei-Zen
    Yang, Meng-Han
    [J]. COMPUTERS & ELECTRICAL ENGINEERING, 2018, 68 : 437 - 446
  • [38] Advanced Time Series Forecasting Methods
    Egrioglu, Erol
    Khashei, Mehdi
    Aladag, Cagdas Hakan
    Turksen, I. Burhan
    Yolcu, Ufuk
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2015, 2015
  • [39] Design for Assembly in Series Production by Using Data Mining Methods
    Kretschmer, Ralf
    Rulhoff, Stefan
    Stjepandic, Josip
    [J]. MOVING INTEGRATED PRODUCT DEVELOPMENT TO SERVICE CLOUDS IN THE GLOBAL ECONOMY, 2014, 1 : 379 - 388
  • [40] Forecasting Banana Harvest Area and Production in Turkey Using Time Series Analysis
    Eyduran, Sadiye Peral
    Akin, Meleksen
    Eyduran, Ecevit
    Celik, Senol
    Erturk, Yakup Erdal
    Ercisli, Sezai
    [J]. ERWERBS-OBSTBAU, 2020, 62 (03): : 281 - 291