Environmentally constrained reliability-based generation maintenance scheduling considering demand-side management

被引:18
|
作者
Mollahassani-Pour, Mojgan [1 ]
Rashidinejad, Masoud [2 ]
Pourakbari-Kasmaei, Mahdi [3 ]
机构
[1] Univ Sistan & Baluchestan, Fac Elect & Comp Engn, Zahedan, Iran
[2] Shahid Bahonar Univ Kerman, Dept Elect Engn, Kerman, Iran
[3] Aalto Univ, Dept Elect Engn & Automat, Maarintie 8, Espoo 02150, Finland
基金
美国国家科学基金会;
关键词
linearisation techniques; power generation scheduling; power generation reliability; power generation economics; demand side management; reliability index; average net reserve value; emission level; GM scheduling; GAMS modelling language; reliability-based generation maintenance scheduling; demand-side management; demand-side resources; power system reliability; lexicographic preferences; environmental issues; power systems; GM problem; correlation constraints; multitarget generation maintenance model; IMPACTS; UNITS; MODEL;
D O I
10.1049/iet-gtd.2018.5713
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This study scrutinises the impacts of demand-side resources (DSRs) on the power system reliability via a novel multi-target generation maintenance (GM) model. The nominated model uses the lexicographic preferences to hierarchically consider the environmental issues, economics, and reliability of power systems. In this regard, the produced emission, which reflects the per unit produced pollutant values in different locations, is minimised. Taking into account the environmental constraints, the total incurred expenditures, including operating and maintenance costs, reserves costs, and total incentives are also minimised. Subsequently, the GM problem considering the correlation constraints is handled while the reliability index, the average net reserve value, is maximised over the scheduling horizon. The DSRs improve the system reliability such that the total costs, and emission level, do not exceed the situation in which DSRs are not available. The GM scheduling is a highly complicated problem and considering DSRs makes it even more complicated. To handle this problem more efficiently, appropriate linearisation technique is used, while the proposed model is formulated in GAMS modelling language. To evaluate the capability of DSRs in system reliability improvement, the modified 24-bus IEEE-RTS is conducted. Results indicate that by selecting proper location and incentives, significant improvement is obtained.
引用
收藏
页码:1153 / 1163
页数:11
相关论文
共 50 条
  • [31] Reliability-Based Scheduling of Pavement Rehabilitation Considering Imperfect Repair
    Das, Saswati
    Siddagangaiah, Anjan Kumar
    JOURNAL OF TRANSPORTATION ENGINEERING PART B-PAVEMENTS, 2022, 148 (01)
  • [32] Active and Passive Combined Response Strategy of Demand-side Resources Considering Response Reliability
    Dou, Xun
    Wang, Jun
    Zeng, Haohui
    Du, Wei
    Zuo, Juan
    Zhao, Jianli
    Dou, Zhenlan
    Dianwang Jishu/Power System Technology, 2024, 48 (08): : 3207 - 3216
  • [33] Reliability-based maintenance and job scheduling for identical parallel machines
    Jamshidi, R.
    Esfahani, Mir Mehdi Seyyed
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (04) : 1216 - 1227
  • [34] Operating Reliability Evaluation of Power Systems With Demand-Side Resources Considering Cyber Malfunctions
    Jia, Heping
    Shao, Changzheng
    Liu, Dunnan
    Singh, Chanan
    Ding, Yi
    Li, Yanbin
    IEEE ACCESS, 2020, 8 : 87354 - 87366
  • [36] Peak Load Appliance Scheduling for Demand-Side Management in the Future Smart Grids
    Jond, Hossein Barghi
    Benveniste, Rifat
    Nabiyev, Vasif V.
    2015 3RD INTERNATIONAL ISTANBUL SMART GRID CONGRESS AND FAIR (ICSG), 2015,
  • [37] Demand-Side Management via Distributed Energy Generation and Storage Optimization
    Atzeni, Italo
    Ordonez, Luis G.
    Scutari, Gesualdo
    Palomar, Daniel P.
    Rodriguez Fonollosa, Javier
    IEEE TRANSACTIONS ON SMART GRID, 2013, 4 (02) : 866 - 876
  • [38] Distributionally robust frequency dynamic constrained unit commitment considering uncertain demand-side resources
    Yang, Yang
    Chih-Hsien, Jimmy
    Ye, Zhi-Sheng
    APPLIED ENERGY, 2023, 331
  • [39] Reliability Improvement in an Isolated Microgrid Considering Demand Side Management
    Valbuena G, Julian
    Mancera R, Mateo
    Pavas, Andres
    2017 IEEE WORKSHOP ON POWER ELECTRONICS AND POWER QUALITY APPLICATIONS (PEPQA), 2017, : 237 - 242
  • [40] A tri-objectives scheduling model for renewable-hydrogen-based microgrid system considering hydrogen storage system and demand-side management
    Karimi, Hamid
    INTERNATIONAL JOURNAL OF HYDROGEN ENERGY, 2024, 68 : 1412 - 1422