The Simulation Study of Multicycle Injection-production of the Underground Gas Storage in the High Water Cut Reservoir

被引:0
|
作者
Chang, Jin [1 ]
Gao, Shusheng
Xu, Ke
机构
[1] CNPC, Inst Porous Flow & Fluid Mech, Langfang 065007, Peoples R China
关键词
high water cut reservoir; multicycle injection-production; the efficiency of the gas operation; reservoir geological features; injection pressure;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
It is unavoidable of the complex coexistence of gas, water and oil phase in the underground gas storage which is built after the late water flooding of the high water cut sandstone reservoir. This paper does experiments of setting and unsetting pressure of multicycle injection-production experiment using plane visual glass model. The process of the gas operation can be seen intuitively of the anticline structure model, plane homogeneous model and plane heterogeneity model. Moreover, two main influence factors for the efficiency of the gas operation are concluded. The result shows: the capacity of the gas storage and the efficiency of the gas operation are tend to be stable after multicycle injection-production. The efficiency of the gas operation has a closely relationship with reservoir geological features and injection pressure. The conclusion has guiding roles for building and operating underground gas storage of high water cut sandstone reservoir.
引用
下载
收藏
页码:376 / 379
页数:4
相关论文
共 50 条
  • [21] Injection-production mechanisms and key evaluation technologies for underground gas storages rebuilt from gas reservoirs
    Sun J.
    Xu H.
    Wang J.
    Shi L.
    Li C.
    Tang L.
    Zhong R.
    Natural Gas Industry, 2018, 38 (04) : 138 - 144
  • [22] Analysis of depleted gas reservoir underground gas storage wellbore integrity change during gas injection and production processes
    Wang, Rui
    Yan, Yifei
    Liu, Yifan
    Kuru, Ergun
    Liu, Minggang
    Yan, Xiangzhen
    JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2022, 215
  • [23] A numerical simulation study on mixing of inert cushion gas with working gas in an underground gas storage reservoir
    Kilinçer, N
    Gümrah, F
    ENERGY SOURCES, 2000, 22 (10): : 869 - 879
  • [24] Study on Injection-production Well Connectedness Evaluation Method in Polymer Flooding Reservoir
    Chen, Fuzhen
    Jiang, Hanqiao
    Yang, Jing
    Liu, Dongmei
    Sun, Liang
    Li, Yuanyuan
    NATURAL RESOURCES AND SUSTAINABLE DEVELOPMENT, PTS 1-3, 2012, 361-363 : 377 - 380
  • [25] A Fuzzy Method to Judge Water Passages with Ineffective Injection-production for Heterogeneous Sandstone Reservoir
    Sun Pengxiao
    NATURAL RESOURCES AND SUSTAINABLE DEVELOPMENT II, PTS 1-4, 2012, 524-527 : 1306 - 1309
  • [26] Feasibility evaluation of underground gas storage construction from volatile oil reservoirs based on experimental analysis of flow in multicycle gas injection–production
    Liu W.
    Wang Q.
    Sun Y.
    Gao G.
    He H.
    Jia Q.
    Xiang Z.
    Lei H.
    Liu Z.
    Natural Gas Industry, 2022, 42 (12) : 65 - 71
  • [27] Optimization of energy production from an underground gas storage reservoir
    Sinayuc, C
    Gümrah, F
    Kucukeksi, MS
    ENERGY SOURCES, 2000, 22 (05): : 465 - 477
  • [28] Simulation and Optimization of Surface Gas Injection Systems for Underground Gas Storage
    Lin, Mingzhen
    Yan, Guanghong
    Liu, Ting
    Wu, Xiayue
    Yu, Pengpeng
    ACS OMEGA, 2023, 8 (35): : 32099 - 32107
  • [29] Application of logistic cycle model to determine high water co ntent reservoir reasonable injection-production ratio
    Hu Qihao
    Wang Hongmei
    Wang Xia
    Yang Huipeng
    Du Jiande
    Yang Kai
    2018 2ND INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2018), 2018, 153
  • [30] A New Method base on Water Drive Curve for Determining the Reasonable Injection-Production Ratio for High Water-Cut Oilfield
    ZHANG Zhang
    QUAN Honghui
    XU Zhongbo
    HE Xinrong
    LI Jun
    Acta Geologica Sinica(English Edition), 2015, (S1) : 346 - 346