共 50 条
- [1] Method to Predict the Reasonable Injection Adjustment at the Later Stage of Waterflooding Oilfield with High Water-cut 2010 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2010,
- [2] Research on reasonable injection-production ratio of water flooding in the high water cut stage of Lamadian oil field PROCEEDINGS OF THE 2017 4TH INTERNATIONAL CONFERENCE ON EDUCATION, MANAGEMENT AND COMPUTING TECHNOLOGY (ICEMCT 2017), 2017, 101 : 81 - 84
- [3] Application of New Water Flooding Characteristic Curve in the High Water-Cut Stage of an Oilfield FDMP-FLUID DYNAMICS & MATERIALS PROCESSING, 2022, 18 (03): : 661 - 677
- [5] Well Pattern Modification and Injection-production Optimization for Extra-high Water Cut Oilfield 2019 5TH INTERNATIONAL CONFERENCE ON GREEN MATERIALS AND ENVIRONMENTAL ENGINEERING, 2020, 453
- [6] The Research On Improving The Efficiency Of Injection-Production Of The Lamadian Oilfield In Ultra-High Water Cut Stage RESOURCES AND SUSTAINABLE DEVELOPMENT, PTS 1-4, 2013, 734-737 : 1484 - 1487
- [7] Reasonable water injection rate calculation for water flooding reservoirs at different water-cut stages Shiyou Kan Tan Yu Kai Fa/Petroleum Exploration and Development, 25 (03): : 69 - 71
- [9] An analytical method for calculating water cut of producers in injection-production pattern Shiyou Xuebao/Acta Petrolei Sinica, 2010, 31 (03): : 471 - 474
- [10] Application of logistic cycle model to determine high water co ntent reservoir reasonable injection-production ratio 2018 2ND INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2018), 2018, 153