Well Pattern Modification and Injection-production Optimization for Extra-high Water Cut Oilfield

被引:1
|
作者
Sun, Renyuan [1 ,2 ]
Chen, Yu [1 ,2 ]
Huang, Yingsong [3 ]
Cao, Gang [3 ]
Huang, Aixian [4 ]
Liu, Lijie [3 ]
Liu, Zhihong [3 ]
机构
[1] China Univ Petr East China, Sch Petr Engn, Qingdao 266580, Shandong, Peoples R China
[2] Minist Educ, Key Lab Unconvent Oil & Gas Dev, Qingdao 266580, Shandong, Peoples R China
[3] Shengli Oilfield Co, Res Inst Petr Explorat & Dev, Dongying 257000, Shandong, Peoples R China
[4] Shengli Oilfield Co, Dongxin Oil Prod Plant, Dongying 257000, Shandong, Peoples R China
关键词
Extra-high water cut; well pattern modification; injection and production optimization;
D O I
10.1088/1755-1315/453/1/012025
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The extra-high water cut stage is still an important stage of oil production. In order to develop the oilfield in this stage, a reservoir model was established using the geological and production history data of a block in Shengli Oilfield. Based on the history matching result, the numerical reservoir simulation of the modification was carried out from row injection well pattern to different well patterns. On the basis of residual oil distribution, balanced injection-production and formation pressure distribution, the optimal well pattern for this block was optimized The well spacing for different well pattern was also simulated. The optimal well spacing was determined by the net present value (NPV) method, and the timing of well pattern modification was determined by the relationship between NPV peak and water cut. Latin hypercube sampling method was used to design the injection-production parameter schemes. The optimal injection and production parameters range of row and nine point well pattern was determined respectively. This research results can be used for reference in the development and adjustment of similar oilfields in the extra-high water cut period.
引用
收藏
页数:6
相关论文
共 50 条
  • [1] Fine Correlation and Well Pattern Optimization of Extra-high Water Cut Reservoirs: Case Study of-With Fuyu Oilfield as an Example
    Li Z.
    Wang H.
    Jiang Z.
    Yue B.
    Wu Z.
    Journal of Engineering Science and Technology Review, 2022, 15 (03) : 197 - 209
  • [2] Water cut analysis and optimization of injection-production system for densifying well network
    Yin, Xiaoju
    Lu, Shiyu
    Wang, Yuxin
    Du, Zhiliang
    Li, Yunxiang
    ENERGY REPORTS, 2022, 8 : 1578 - 1584
  • [3] Optimization of Automatic Well Pattern Deployment in High Water-Cut Oilfield
    Li, Xianing
    Zhang, Jiqun
    Chang, Junhua
    Wang, Liming
    Wu, Li
    Cui, Lining
    Jia, Deli
    JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 2023, 145 (11):
  • [4] The Research On Improving The Efficiency Of Injection-Production Of The Lamadian Oilfield In Ultra-High Water Cut Stage
    Nie Chunlin
    Ma Shizhong
    Chen, Hongkui
    RESOURCES AND SUSTAINABLE DEVELOPMENT, PTS 1-4, 2013, 734-737 : 1484 - 1487
  • [5] An analytical method for calculating water cut of producers in injection-production pattern
    Xu, Hanbing
    Li, Xiangfang
    Shi, Depei
    Chen, Guijun
    Zhang, Qiang
    Shiyou Xuebao/Acta Petrolei Sinica, 2010, 31 (03): : 471 - 474
  • [6] The optimization of the well pattern thinning at high water cut stages in CD Heterogeneity oilfield
    Ming, Yukun
    UNCONVENTIONAL RESOURCES, 2024, 4
  • [7] Potential excavation technology for thick formations of extra-high water cut period in Lamadian Oilfield
    Wang, Dexi
    Zhang, Jianjun
    Gao, Zhigang
    Yu, Xinghua
    Wang, Chuan
    Shiyou Xuebao/Acta Petrolei Sinica, 2007, 28 (01): : 98 - 100
  • [8] A New Method base on Water Drive Curve for Determining the Reasonable Injection-Production Ratio for High Water-Cut Oilfield
    ZHANG Zhang
    QUAN Honghui
    XU Zhongbo
    HE Xinrong
    LI Jun
    Acta Geologica Sinica(English Edition), 2015, (S1) : 346 - 346
  • [9] Research on mechanism of enhanced oil recovery using immobilizing movable water in continental extra-high water cut oilfield
    Wang, You-Qi
    Zhongguo Shiyou Daxue Xuebao (Ziran Kexue Ban)/Journal of China University of Petroleum (Edition of Natural Science), 2012, 36 (06): : 108 - 112
  • [10] Research and Practice on Implementing Segmented Production Technology of Horizontal Well during Extra-High Water Cut Stage with Bottom Water Reservoir
    Zhang, Dong
    Li, Yanlai
    Zhang, Zongchao
    Li, Fenghui
    Liu, Hongjie
    PROCESSES, 2024, 12 (06)