Numeriacal simulation analysis of 3D initial geostress field for slope of the hydropower station

被引:0
|
作者
Wang, Yu [1 ]
Wang, Ruihong [1 ]
Deng, Huafeng [1 ]
机构
[1] China Three Gorges Univ, Minist Educ, Key Lab Geol Hazards Three Gorges Reservoir Area, Yichang 443002, Hubei, Peoples R China
关键词
3D initial geostress; finite element method; numerical simulation;
D O I
10.4028/www.scientific.net/AMM.71-78.4274
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
According to the specific geological and topographical conditions at slope of the Hydropower Station, considering the shape and size of simulation geometric model, the position relationship between the simulated area and buildings of terminal area and boundary conditions, the dynamic model which is fit to the geological structure are selected. Using the measured stress distribution as constrained conditions, 3D initial geostress field of research area are simulated using FLAC3D program. The result of simulation analysis shows that 3D initial geostress field of research area are accurately simulated based on good combination between the measured stress data and numeriacal simulation. So as to provide a reasonable basis for further condition simulation, such as excavation and unloading conditions. It has important significance for similar geological environment projects that the method is successfully applied to simulate initial geostress of this area.
引用
收藏
页码:4274 / 4277
页数:4
相关论文
共 50 条
  • [1] 3D Numeriacal Simulation for Slope of the Hydropower Station Considering Multi-conditions
    Wang Yu
    Li Jianlin
    2010 INTERNATIONAL SYMPOSIUM ON MULTI-FIELD COUPLING THEORY OF ROCK AND SOIL MEDIA AND ITS APPLICATIONS, 2010, : 517 - 524
  • [2] Regression analysis of 3D initial geostress field for dam site of Xiaowan Hydropower Station
    Gu Yan-chang
    Zheng Dong-jian
    Guo Hang-zhong
    He Xian-feng
    ROCK AND SOIL MECHANICS, 2008, 29 (04) : 1015 - +
  • [3] Nonlinear inversion of 3D initial geostress field in Jinping II Hydropower Station region
    Jiang Quan
    Feng Xia-ting
    Chen Jian-lin
    Zhang Chun-sheng
    Huang Shu-ling
    ROCK AND SOIL MECHANICS, 2008, 29 (11) : 3003 - 3010
  • [4] Regression analysis of 3D initial geostress in region of underground powerhouse for large hydropower station
    Xie Hong-qiang
    He Jiang-da
    Xiao Ming-li
    ROCK AND SOIL MECHANICS, 2009, 30 (08) : 2471 - 2476
  • [5] Regression analysis of initial geostress field in dam zone of Dagangshan hydropower station
    Zhang Jian-guo
    Zhang Qiang-yong
    Yang Wen-dong
    Zhang Xin
    ROCK AND SOIL MECHANICS, 2009, 30 (10) : 3071 - 3078
  • [6] Regression analysis of initial geostress field in dam zone of Dagangshan hydropower station
    Research Center of Geotechnical and Structural Engineering, Shandong University, Jinan 250061, China
    不详
    Rock Soil Mech, 2009, 10 (3071-3078):
  • [7] Back analysis of initial geostress field for underground powerhouse zone of Shuangjiangkou hydropower station
    Geotechnical and Structural Engineering Research Center, Shandong University, Jinan
    250061, China
    不详
    257400, China
    不详
    250013, China
    Tumu Gongcheng Xuebao, 8 (86-95): : 86 - 95
  • [8] Back analysis of 3D initial geostress field based on variogram function
    Fang, Mingli
    Xiao, Ming
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2015, 34 (08): : 1594 - 1601
  • [9] Back analysis of 3D initial geostress of underground powerhouse of Pushihe Pumped Storage Power Station
    Liu Zhong-fu
    Liu Tian-peng
    Cai Hong-liang
    Xu Xiao-wu
    ROCK AND SOIL MECHANICS, 2008, 29 : 181 - 184
  • [10] 3D Geostress Field BP Analysis of Wushaoling Tunnel
    Chen Zhimin
    Zhao De-an
    Li Shuangyang
    CIVIL ENGINEERING IN CHINA - CURRENT PRACTICE AND RESEARCH REPORT, 2010, : 678 - +