Numeriacal simulation analysis of 3D initial geostress field for slope of the hydropower station

被引:0
|
作者
Wang, Yu [1 ]
Wang, Ruihong [1 ]
Deng, Huafeng [1 ]
机构
[1] China Three Gorges Univ, Minist Educ, Key Lab Geol Hazards Three Gorges Reservoir Area, Yichang 443002, Hubei, Peoples R China
关键词
3D initial geostress; finite element method; numerical simulation;
D O I
10.4028/www.scientific.net/AMM.71-78.4274
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
According to the specific geological and topographical conditions at slope of the Hydropower Station, considering the shape and size of simulation geometric model, the position relationship between the simulated area and buildings of terminal area and boundary conditions, the dynamic model which is fit to the geological structure are selected. Using the measured stress distribution as constrained conditions, 3D initial geostress field of research area are simulated using FLAC3D program. The result of simulation analysis shows that 3D initial geostress field of research area are accurately simulated based on good combination between the measured stress data and numeriacal simulation. So as to provide a reasonable basis for further condition simulation, such as excavation and unloading conditions. It has important significance for similar geological environment projects that the method is successfully applied to simulate initial geostress of this area.
引用
收藏
页码:4274 / 4277
页数:4
相关论文
共 50 条
  • [21] Study on inverse analysis of 3-D initial geostress field with optimized displacement boundaries
    Guo Ming-wei
    Li Chun-guang
    Wang Shui-lin
    Luan Guang-bo
    ROCK AND SOIL MECHANICS, 2008, 29 (05) : 1269 - 1274
  • [22] Stability analysis of left bank rock slope at Baihetan hydropower station based on RFPA(3D) software and microseismic monitoring
    Yang Ying
    Xu Nu-wen
    Li Tao
    Dai Feng
    Fan Yi-lin
    Xu Jian
    Li Biao
    ROCK AND SOIL MECHANICS, 2018, 39 (06) : 2193 - 2202
  • [23] Microseismic Monitoring and 3D Finite Element Analysis of the Right Bank Slope, Dagangshan Hydropower Station, during Reservoir Impounding
    Xingzong Liu
    Chun’an Tang
    Lianchong Li
    Pengfei Lv
    Hongyuan Liu
    Rock Mechanics and Rock Engineering, 2017, 50 : 1901 - 1917
  • [24] Microseismic Monitoring and 3D Finite Element Analysis of the Right Bank Slope, Dagangshan Hydropower Station, during Reservoir Impounding
    Liu, Xingzong
    Tang, Chun'an
    Li, Lianchong
    Lv, Pengfei
    Liu, Hongyuan
    ROCK MECHANICS AND ROCK ENGINEERING, 2017, 50 (07) : 1901 - 1917
  • [25] Inversion analysis of initial geostress in dam site of Guandi hydropower project
    He, Jiang-Da
    Xie, Hong-Qiang
    Wang, Qi-Zhi
    Xiao, Ming-Li
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2009, 31 (02): : 166 - 171
  • [26] Research on initial stress field of Baihetan hydropower station
    Jin Chang-yu
    Feng Xia-ting
    Zhang Chun-sheng
    ROCK AND SOIL MECHANICS, 2010, 31 (03) : 845 - +
  • [27] Stability Analysis of Dangerous Rocks on the Slope of a Hydropower Station
    Li Haifeng
    Zhang Guoxin
    Huang Tao
    Zhou Qiujing
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 621 - 629
  • [28] Study advance on in-site geostress measurement and analysis of initial geostress field in China
    Jing Feng
    Sheng Qian
    Zhang Yong-hui
    Liu Yuan-kun
    ROCK AND SOIL MECHANICS, 2011, 32 : 51 - 58
  • [29] Slope Stability Analysis for a Large Hydropower Station in China
    Yin, Dongbin
    Liu, Huifen
    Yan, Jingwen
    Wang, Jianqiang
    SUSTAINABILITY, 2023, 15 (04)
  • [30] Study advance on in-site geostress measurement and analysis of initial geostress field in China
    Jing, Feng
    Sheng, Qian
    Zhang, Yong-Hui
    Liu, Yuan-Kun
    Yantu Lixue/Rock and Soil Mechanics, 2011, 32 (SUPPL.2): : 51 - 58